Orange County · Florida

Engineering Services in Orlando

MEP, structural, civil, and energy-compliance engineering for Orlando projects — permitted through City of Orlando Permitting Services Division (Economic Development Department) and designed to the city's adopted codes and amendments.

Services in Orlando

Orlando Design Environment

Permit Office (AHJ)
City of Orlando Permitting Services Division (Economic Development Department)
Building Code
Florida Building Code, 8th Edition (2023), based on the 2021 IBC with Florida amendments; standard (non-HVHZ) wind provisions apply
Energy Code
Florida Building Code — Energy Conservation, 8th Edition (2023), with ASHRAE 90.1 as an alternate commercial path
Electric Utility
Orlando Utilities Commission (OUC — 'The Reliable One'), a municipal utility, serves most of the City of Orlando; Duke Energy Florida serves adjacent portions of the metro

As a non-HVHZ jurisdiction, Orlando designs to standard FBC wind pressures with Florida Product Approval for components rather than Miami-Dade NOAs. Local layers that reshape design include City of Orlando and Orange County stormwater and floodplain ordinances, the city's Green Works / building-performance initiatives, and coordination with the regional water management district for master drainage.

Orlando's construction market is anchored by tourism and hospitality (theme parks, convention, and resort development around International Drive), strong in-migration and multifamily growth, healthcare and the Lake Nona Medical City / life-science cluster, and expanding logistics and higher-education activity. That pipeline keeps Permitting Services' review queues active, and stormwater/floodplain review often paces site schedules.

One Organization, Connected Delivery

Orlando Engineering FAQs

Is Orlando in Florida's High-Velocity Hurricane Zone?
No. Orlando is inland in Orange County, so it uses standard Florida Building Code wind provisions rather than the HVHZ rules that apply only in Miami-Dade and Broward. That means design to standard FBC wind pressures (about 140 mph ultimate) with Florida Product Approval for components instead of Miami-Dade NOAs, plus windborne-debris protection where the wind zone requires it.
Which utility will serve my Orlando project?
Most of the City of Orlando is served by the Orlando Utilities Commission (OUC), a municipal utility with its own commercial rates, demand charges, and interconnection process, while Duke Energy Florida serves adjacent parts of the metro. OUC also offers district chilled-water cooling in parts of downtown, which can remove the central cooling plant from a building's scope, so we confirm the serving utility during schematic design.
How does central-Florida karst affect Orlando site and foundation design?
It can be decisive. Sinkhole and soft-ground potential over limestone means the geotechnical report governs foundation selection — sometimes driving deep foundations or ground improvement — and it shapes stormwater pond siting so runoff is not concentrated over potential features. Combined with high water tables, karst is a central reason we coordinate structural and civil design with subsurface findings early.

Verified Local Sources

Reviewed 2026-09-11. Code editions and local requirements can change; confirm the current requirements with the authority having jurisdiction before design.

More Locations

Build in Orlando with Apex Grid

Commercial plan review runs through the City of Orlando's online Accela Citizen Access / e-permitting system, with electronic submittal and multi-discipline review across building, structural, MEP, zoning, and engineering. Orlando is not in the High-Velocity Hurricane Zone, so it uses standard Florida Building Code wind provisions with Florida Product Approval rather than Miami-Dade NOAs. Private provider (private inspector/plan reviewer) service is available under Florida statute to accelerate qualifying projects, and larger developments run through concurrent development and engineering review.