Orlando, FL · Licensed Professional Engineering
Energy compliance handled as engineering, not paperwork — documentation matched to the exact code edition your permitting jurisdiction enforces.
Orlando enforces the Florida Building Code — Energy Conservation, 8th Edition (2023), with ASHRAE 90.1 as an alternate, so COMcheck or energy-model documentation must target that edition. In the hot-humid zone 2A climate, compliance centers on controlling solar heat gain and latent load rather than heating: low-SHGC glazing, exterior shading, cool roofs under intense sun, and high-efficiency, dehumidification-capable cooling plants are the highest-leverage moves, while added wall insulation returns little. Where OUC district chilled water serves a downtown building, plant efficiency shifts off-site and changes the compliance strategy. We reconcile envelope, mechanical, and lighting compliance as one package through the city's e-permitting workflow and integrate the moisture-control detailing the code and climate both demand.
Code adoptions and local amendments change on multi-year cycles. The state source verification date is 2026-07-28; we verify the governing editions with City of Orlando Permitting Services Division (Economic Development Department) at project kickoff.
Commercial plan review runs through the City of Orlando's online Accela Citizen Access / e-permitting system, with electronic submittal and multi-discipline review across building, structural, MEP, zoning, and engineering. Orlando is not in the High-Velocity Hurricane Zone, so it uses standard Florida Building Code wind provisions with Florida Product Approval rather than Miami-Dade NOAs. Private provider (private inspector/plan reviewer) service is available under Florida statute to accelerate qualifying projects, and larger developments run through concurrent development and engineering review.
As a non-HVHZ jurisdiction, Orlando designs to standard FBC wind pressures with Florida Product Approval for components rather than Miami-Dade NOAs. Local layers that reshape design include City of Orlando and Orange County stormwater and floodplain ordinances, the city's Green Works / building-performance initiatives, and coordination with the regional water management district for master drainage.
OUC is a municipal provider with its own commercial rate schedules, demand charges, and interconnection process, and OUC also provides chilled-water district cooling in parts of downtown that changes central-plant scope. New large services can carry transformer lead times we confirm early. OUC and Orange County Utilities provide water and reclaimed water, and reclaimed-water availability affects irrigation and site design.
Orlando's construction market is anchored by tourism and hospitality (theme parks, convention, and resort development around International Drive), strong in-migration and multifamily growth, healthcare and the Lake Nona Medical City / life-science cluster, and expanding logistics and higher-education activity. That pipeline keeps Permitting Services' review queues active, and stormwater/floodplain review often paces site schedules.
Reviewed 2026-09-11. Code editions and local requirements can change; confirm the current requirements with the authority having jurisdiction before design.
With a team of licensed PEs and a multi-discipline engineering team, we're ready to take on projects of any size — and we turn quotes around fast. Send us your scope and get a clear proposal: deliverables, timeline, and fee.
Request a Proposal