Atlanta, GA · Licensed Professional Engineering
Energy compliance handled as engineering, not paperwork — documentation matched to the exact code edition your permitting jurisdiction enforces.
Atlanta enforces Georgia's statewide amended energy code — the 2015 IECC with Georgia supplements — so COMcheck or energy-model documentation must target that Georgia-amended edition, with ASHRAE 90.1 available as an alternate. In the warm, humid zone 3A climate, compliance economics favor blocking sun and moisture: low-SHGC glazing, exterior shading, and a well-sealed envelope pay back faster than piling on roof R-value, and dehumidification-capable cooling plants matter more than the climate file's economizer credit suggests once the heat island is accounted for. We reconcile envelope, mechanical, and lighting compliance as one package and resolve plan-check comments directly through the Atlanta ePlans review workflow rather than treating each trade in isolation.
Code adoptions and local amendments change on multi-year cycles. The state source verification date is 2026-07-28; we verify the governing editions with City of Atlanta Department of City Planning, Office of Buildings at project kickoff.
Commercial plan review runs through the Atlanta ePlans / Accela Citizen Access online portal, where drawings are submitted, reviewed, and marked up electronically across building, site development, fire, and utility disciplines. The Office of Buildings routes large projects through concurrent multi-discipline review and offers pre-application and Special Administrative Permit (SAP) meetings for major developments. Site Development Permits are reviewed separately and often pace the overall schedule more than the building permit.
Because Georgia's code is mandatory statewide, Atlanta cannot adopt a weaker edition, but the city layers on its own site, zoning, and stormwater ordinances that reshape projects — most notably the Post-Development Stormwater Management Ordinance and a strict tree-protection ordinance administered by the city arborist. Confirm current DCA amendment years, which update annually.
Georgia Power's commercial rates carry meaningful demand charges, and large new services — data centers, life-science labs, and towers — can face transformer and substation lead times, so we confirm available capacity early. Water and sewer are City of Atlanta Department of Watershed Management services, and combined-sewer areas in the older core add capacity-fee and inflow considerations.
Atlanta is the Southeast's dominant commercial construction market, driven by corporate relocations and headquarters, a large film-and-studio infrastructure buildout, one of the nation's biggest data-center corridors in the metro's periphery, and heavy healthcare, higher-education, and mixed-use activity along the BeltLine and Midtown. That volume keeps the Office of Buildings' review queues busy, which makes early site-development and stormwater coordination essential to schedule.
Reviewed 2026-09-11. Code editions and local requirements can change; confirm the current requirements with the authority having jurisdiction before design.
With a team of licensed PEs and a multi-discipline engineering team, we're ready to take on projects of any size — and we turn quotes around fast. Send us your scope and get a clear proposal: deliverables, timeline, and fee.
Request a Proposal