Integrated Architecture · Engineering · Permitting
Apex Grid coordinates commercial architecture with structural, MEP, civil, and energy-code disciplines for permit-ready Orlando projects.
Architect-of-record and firm authorization are confirmed from current Florida board records before proposal. The team can deliver architectural design and coordinate the engineering package for commercial work in Orlando, subject to a project-specific scope and local requirements review.
Commercial plan review runs through the City of Orlando's online Accela Citizen Access / e-permitting system, with electronic submittal and multi-discipline review across building, structural, MEP, zoning, and engineering. Orlando is not in the High-Velocity Hurricane Zone, so it uses standard Florida Building Code wind provisions with Florida Product Approval rather than Miami-Dade NOAs. Private provider (private inspector/plan reviewer) service is available under Florida statute to accelerate qualifying projects, and larger developments run through concurrent development and engineering review. Orlando's construction market is anchored by tourism and hospitality (theme parks, convention, and resort development around International Drive), strong in-migration and multifamily growth, healthcare and the Lake Nona Medical City / life-science cluster, and expanding logistics and higher-education activity. That pipeline keeps Permitting Services' review queues active, and stormwater/floodplain review often paces site schedules.
Local codes, amendments, zoning rules, contractor requirements, and permit processes change. Apex Grid verifies the governing requirements for the exact site and scope before work begins.
Send Apex Grid the site, project type, and intended scope. The team will confirm fit, local requirements, deliverables, schedule, and fee before work begins.
Request a Proposal