MEP Permit Comment Resolution and PE Sealing
By Jeremy Mills, CEO & Founder, Apex Grid Engineering — USAF Veteran. · Updated 2026-09-15
Plan-check corrections that change MEP engineering must be re-sealed by the PE in responsible charge before resubmittal — treat comment resolution as a mini review-and-seal: engineer the changes, update sheets and calculations, verify, seal, and respond to every comment individually.
I'm Jeremy Mills, CEO & Founder of Apex Grid Engineering and a U.S. Air Force veteran. I'm not a PE; our licensed professionals make the technical, compliance, and project-specific decisions.
The comment-resolution workflow
Our MEP comment resolution follows a fixed sequence. We log every reviewer comment against the sealed set, and the PE classifies each: engineering change, drafting clarification, or documentation addition. Engineering changes get redesigned and recalculated — the PE verifies the revised design to the same standard as the original review. Drafting clarifications are made precisely as the reviewer asked. Documentation additions (a missing schedule, an energy form) are produced and checked. Every change is clouded on the drawings, calculations are updated where the engineering moved, and the PE seals the revised set. The resubmittal package includes numbered responses to each comment cross-referenced to the clouded changes — the reviewer can verify every item without hunting.
Reading what the reviewer actually means
Plan-check comments are written tersely, and the literal request is not always the real requirement. "Provide duct sizing calculations" on a set that has them usually means the reviewer could not follow or verify the ones provided — the fix is clearer calculations, not the same PDF resubmitted. "Clarify equipment schedule" may mean the selections do not match the loads. Our PEs read corrections diagnostically: what engineering concern produced this comment, and what change resolves the concern rather than just answering the question? Resolving the underlying concern closes the cycle; answering the surface question often produces a follow-up comment asking the real question. This diagnostic reading is where an experienced PE earns the fee during comment resolution.
MEP comment resolution checklist
A correction cycle closes fastest when these items are all handled. Completeness and clarity are the entire strategy. • Every reviewer comment logged and classified: engineering change, clarification, or documentation • Engineering changes redesigned, recalculated, and re-verified by the sealing PE • All changes clouded on drawings; calculations updated wherever engineering moved • Revised set re-sealed by the PE in responsible charge before resubmittal • Numbered responses matching the reviewer's list, cross-referenced to clouded changes
Which related engineering resources can help?
What else do project teams ask?
Do revised MEP sheets need a new PE seal after corrections?
Can a different PE seal the corrections than sealed the original set?
What makes MEP correction responses get rejected?
How many correction cycles should I plan for on MEP permits?