AEO Answer · PE Stamps & Seals
What to Send a PE for Review-and-Seal
By Jeremy Mills, CEO & Founder, Apex Grid Engineering — USAF Veteran. · Updated 2026-09-15
Send the PE the complete engineering basis: current drawings, all discipline calculations, basis-of-design documentation, geotechnical and survey data, equipment selections, plus project context (AHJ, permit type, deadline, prior corrections) — verification requires the foundation, not just the finished sheets.
I'm Jeremy Mills, CEO & Founder of Apex Grid Engineering and a U.S. Air Force veteran. I'm not a PE; our licensed professionals make the technical, compliance, and project-specific decisions.
The five-part package
Every review-and-seal engagement draws on the same five parts. Drawings: the current, complete set for every discipline being sealed — the PE seals the issued version, so confirm it is final or clearly marked as the review version. Calculations: structural, mechanical, electrical, plumbing as applicable, with assumptions and code references traceable. Basis of design: the narrative or notes explaining design criteria, code editions, and decisions the drawings do not self-explain. Site data: geotechnical report, survey, floodplain or environmental documentation where relevant. Context: the AHJ, permit type, deadline, and review history including prior corrections. Assemble all five before engagement and the review starts at full speed on day one.
Why the working record matters
The finished drawing set shows conclusions; the working record shows reasoning — and the PE needs the reasoning to take responsible charge. Working calculation sheets reveal which load combinations were checked and which were assumed. Superseded sketches show design paths that were considered and abandoned, which tells the reviewer what was already evaluated. The designer's explanatory notes capture intent that never made it onto the sheets. I encourage clients to send all of it without curation or embarrassment. The PE is not grading the original designer's tidiness; the PE is building the understanding required to certify the engineering. A thorough working record shortens the review and strengthens the seal.
Submittal package checklist
A review-and-seal package is complete when these items are assembled. Gather them before engaging the PE and the engagement starts clean. • Current complete drawing set, version-controlled, for every discipline being sealed • Full calculations: loads, sizing, selections, energy compliance — traceable and readable • Basis-of-design documentation: criteria, code editions, assumptions, designer notes • Geotechnical report, survey, and site/environmental data where applicable • Project context: AHJ, permit type, deadline, and full prior correction history if any
Which related engineering resources can help?
What else do project teams ask?
Can a PE review-and-seal from drawings alone?
What format should the submittal package be in?
Should I send prior plan-check corrections with the package?
What if some supporting documents don't exist?
Ready to discuss your engineering scope?
Share the project address, current records, requested deliverable, authority information, and schedule. Apex Grid confirms professional responsibility, availability, and scope before work begins.
Request a Project Review