Miami, FL · Licensed Professional Engineering
Energy compliance handled as engineering, not paperwork — documentation matched to the exact code edition your permitting jurisdiction enforces.
Miami enforces the Florida Building Code — Energy Conservation, 8th Edition (2023), with ASHRAE 90.1 as an alternate, so COMcheck or whole-building energy-model documentation must target that edition. In the hot-humid zone 1A climate, compliance is about controlling solar heat gain and latent load rather than heating: low-SHGC and impact-rated glazing (which HVHZ already requires), tight air-sealing against humid infiltration, cool roofs under intense sun, and high-efficiency, dehumidification-capable cooling plants are the highest-leverage moves, while added wall insulation returns little. We reconcile envelope, mechanical, and lighting compliance as one package through the iBuild review workflow and always integrate the moisture-control detailing that both the code and the climate demand to prevent mold and envelope failure.
Code adoptions and local amendments change on multi-year cycles. The state source verification date is 2026-07-28; we verify the governing editions with City of Miami Building Department (within Miami-Dade County's High-Velocity Hurricane Zone) at project kickoff.
Commercial plan review runs through the City of Miami's iBuild online permitting portal, with electronic submittal and review across building, structural, mechanical, electrical, plumbing, and zoning disciplines. Because Miami sits in the High-Velocity Hurricane Zone, submittals must reference Miami-Dade County Product Control Notices of Acceptance (NOAs) for windborne-debris and roofing assemblies, and reviewers scrutinize wind and flood detailing closely. Private provider review is available to accelerate schedules on qualifying projects.
The HVHZ chapter is the defining local layer: it requires enhanced wind-pressure design, mandatory windborne-debris (impact) protection or NOA-approved shutters on all openings, and Miami-Dade Product Control approval (NOA) for exterior components and roofing. The city and county also enforce strict flood-zone (FEMA/base-flood-elevation) and 40-year recertification requirements that shape existing-building work.
FPL commercial rates carry demand charges, and new large services in the dense urban core can require vault or network coordination and transformer lead times we confirm early. Electrical rooms and emergency/standby equipment are commonly designed above base flood elevation for surge resilience. Water and sewer are provided by Miami-Dade Water and Sewer Department (WASD), whose capacity and connection fees factor into site feasibility.
Miami is one of the nation's most active markets, driven by relentless in-migration, a finance-and-tech influx into Brickell and downtown, luxury high-rise residential and hospitality, and cruise-and-logistics activity at PortMiami. Sea-level-rise resilience, flood insurance pressures, and the county's 40-year recertification program shape both new construction and a large existing-building retrofit pipeline.
Reviewed 2026-09-11. Code editions and local requirements can change; confirm the current requirements with the authority having jurisdiction before design.
With a team of licensed PEs and a multi-discipline engineering team, we're ready to take on projects of any size — and we turn quotes around fast. Send us your scope and get a clear proposal: deliverables, timeline, and fee.
Request a Proposal