Construction stormwater in Texas is regulated under the TPDES program administered by the Texas Commission on Environmental Quality (TCEQ). Apex Grid's licensed civil engineers review and seal site and civil plan sets for Texas projects — grading, drainage, utilities, and access designed for Texas's requirements and sealed under responsible charge.

By Apex Grid Engineering · Updated 2026-09-15

Illustrative diagram of the professional engineer review and seal workflow: drawings are reviewed against a checklist, sealed by a licensed PE, and issued as a permit set.

Civil review-and-seal in Texas

Construction stormwater in Texas is regulated under the TPDES program administered by the Texas Commission on Environmental Quality (TCEQ). TxDOT requires access and driveway permits for connections to the state highway system. Floodplain management is a major issue along the Gulf Coast and in Harris County, where post-Harvey regulations tightened detention and finished-floor requirements. A civil seal represents the responsible engineer's professional review of the site engineering record — it is never sold as a standalone product. Where Apex Grid accepts a Texas project, the licensed civil engineer of record defines the scope, reviews the design basis and agency requirements, verifies the grading, drainage, and utility design, and determines which civil documents are eligible for sealing. Apex Grid Engineering is a veteran-owned firm licensed in 49 states, with 10+ licensed professional engineers on the team.

Grading, drainage, utilities, and access on the sealed set

A Texas civil seal from Apex Grid covers the site engineering record: grading and earthwork plans, stormwater management and drainage calculations, water, sewer, and storm utility plans and profiles, paving and access design, and erosion-control documentation. Agency coordination — DOT access permits, water-district approvals, floodplain documentation — is engineered into the set before sealing so the reviewing agencies see their requirements answered on the sheets.

  • Grading, earthwork, and erosion-control plans
  • Stormwater detention/retention design with sealed drainage calculations
  • Water, sewer, and storm utility plans and profiles
  • Agency comment responses on the sealed civil set

How Texas plan review treats civil submittals

Plan review is handled by the local authority having jurisdiction — city building departments in incorporated areas, with counties covering unincorporated areas on a limited basis. Because Texas has no mandatory statewide building code, the adopted code edition varies by city, so confirming the local amendments is the first step on any project.

Texas civil facts that shape the sealed design

Civil design in Texas is governed by local terrain, water, and agency rules — these are the realities the sealed site plan must answer to:

  • Texas has no mandatory statewide building code; each city adopts its own edition of the IBC.
  • Houston is the largest U.S. city with no zoning ordinance, though deed restrictions and development codes still shape projects.
  • The February 2021 winter storm (Uri) caused widespread freeze damage and pushed freeze-protection upgrades into standard practice.

Frequently Asked Questions

What civil documents need a PE seal in Texas?
Grading plans, drainage reports and calculations, utility plans, paving and access design, and stormwater management plans for Texas projects require a licensed civil PE seal for agency and permit review. The seal must show the engineer's name, license number, and date.
Who handles stormwater permitting?
Apex Grid's civil engineers prepare the sealed stormwater design and calculations; the owner or contractor typically holds the construction-phase permit itself. Construction stormwater in Texas is regulated under the TPDES program administered by the Texas Commission on Environmental Quality (TCEQ).
Can Apex Grid seal boundary surveys or ALTA documents?
No — boundary surveying is a separately licensed service. Apex Grid seals the civil engineering design (grading, drainage, utilities, access) and coordinates with the project's licensed surveyor on the underlying survey record.
How are agency comments from DOT or the water district handled?
Agency comments on the civil scope are answered by the engineer of record with revised sealed sheets — access-permit revisions, utility coordination updates, and drainage redesign as the comments require.

Discuss your engineering scope

Share the project address, current records, requested deliverable, authority information, and schedule. Apex Grid confirms professional responsibility, availability, and scope before work begins.

Start an Engineering Estimate

Get a quote on your project

Reviewed and sealed by licensed PEs. “Solid engineering and clear communication from start to finish.” — Jason Mitchell, Principal Architect

Tell us what you need and where the project is — quotes back within 12–24 hours on qualifying scopes.