Construction stormwater discharges are regulated by the Indiana Department of Environmental Management (IDEM) through its construction stormwater general permit, commonly known as the Rule 5 permit. Apex Grid's licensed civil engineers review and seal site and civil plan sets for Indiana projects — grading, drainage, utilities, and access designed for Indiana's requirements and sealed under responsible charge.

By Apex Grid Engineering · Updated 2026-09-15

Illustrative diagram of the professional engineer review and seal workflow: drawings are reviewed against a checklist, sealed by a licensed PE, and issued as a permit set.

Civil review-and-seal in Indiana

Construction stormwater discharges are regulated by the Indiana Department of Environmental Management (IDEM) through its construction stormwater general permit, commonly known as the Rule 5 permit. Access to state highways requires driveway permits from the Indiana Department of Transportation. Erosion control must address the state's glacial soils, and many counties enforce local stormwater and drainage ordinances on top of state requirements. A civil seal represents the responsible engineer's professional review of the site engineering record — it is never sold as a standalone product. Where Apex Grid accepts an Indiana project, the licensed civil engineer of record defines the scope, reviews the design basis and agency requirements, verifies the grading, drainage, and utility design, and determines which civil documents are eligible for sealing. Apex Grid Engineering is a veteran-owned firm licensed in 49 states, with 10+ licensed professional engineers on the team.

Grading, drainage, utilities, and access on the sealed set

A Indiana civil seal from Apex Grid covers the site engineering record: grading and earthwork plans, stormwater management and drainage calculations, water, sewer, and storm utility plans and profiles, paving and access design, and erosion-control documentation. Agency coordination — DOT access permits, water-district approvals, floodplain documentation — is engineered into the set before sealing so the reviewing agencies see their requirements answered on the sheets.

  • Grading, earthwork, and erosion-control plans
  • Stormwater detention/retention design with sealed drainage calculations
  • Water, sewer, and storm utility plans and profiles
  • Agency comment responses on the sealed civil set

How Indiana plan review treats civil submittals

The Indiana Department of Homeland Security reviews building plans for Class 1 structures at the state level, which covers most commercial and multi-family construction. Local building departments issue permits and perform inspections under the Indiana Building Code. Filing with the state plan review office early is standard practice on commercial projects.

Indiana civil facts that shape the sealed design

Civil design in Indiana is governed by local terrain, water, and agency rules — these are the realities the sealed site plan must answer to:

  • Southwest Indiana sits near the Wabash Valley Seismic Zone, giving that region higher seismic design requirements than the rest of the state.
  • Indiana's construction stormwater permit under IDEM is widely known as the Rule 5 permit.
  • The Indiana Department of Homeland Security performs state-level plan review for Class 1 structures, a category that covers most commercial buildings.

Frequently Asked Questions

What civil documents need a PE seal in Indiana?
Grading plans, drainage reports and calculations, utility plans, paving and access design, and stormwater management plans for Indiana projects require a licensed civil PE seal for agency and permit review. The seal must show the engineer's name, license number, and date.
Who handles stormwater permitting?
Apex Grid's civil engineers prepare the sealed stormwater design and calculations; the owner or contractor typically holds the construction-phase permit itself. Construction stormwater discharges are regulated by the Indiana Department of Environmental Management (IDEM) through its construction stormwater general permit, commonly known as the Rule 5 permit.
Can Apex Grid seal boundary surveys or ALTA documents?
No — boundary surveying is a separately licensed service. Apex Grid seals the civil engineering design (grading, drainage, utilities, access) and coordinates with the project's licensed surveyor on the underlying survey record.
How are agency comments from DOT or the water district handled?
Agency comments on the civil scope are answered by the engineer of record with revised sealed sheets — access-permit revisions, utility coordination updates, and drainage redesign as the comments require.

Discuss your engineering scope

Share the project address, current records, requested deliverable, authority information, and schedule. Apex Grid confirms professional responsibility, availability, and scope before work begins.

Start an Engineering Estimate

Get a quote on your project

Reviewed and sealed by licensed PEs. “Solid engineering and clear communication from start to finish.” — Jason Mitchell, Principal Architect

Tell us what you need and where the project is — quotes back within 12–24 hours on qualifying scopes.