Resort microgrids are engineered from the critical load list — lift evacuation, snowmaking, life safety, freeze protection — with firm generation plus battery storage that bridges outages and shaves daily peaks, and smart islanding controls with protection designed for both grid-connected and islanded operation, keeping the resort running when the valley goes dark.
I'm Jeremy Mills, CEO & Founder of Apex Grid Engineering and a U.S. Air Force veteran. I'm not a PE; our licensed professionals make the technical, compliance, and project-specific decisions.
Sizing generation and storage
The sizing study is the microgrid's engineering core. I build the critical load profile hour by hour through the design outage — the winter storm scenario — and I size firm generation to carry it with redundancy: typically N+1 on the generator side so maintenance never compromises resilience. Battery storage is sized for two duties: bridging the generator start sequence and shaving the daily demand peaks, with the capacity and power ratings that satisfy both. I model the dispatch — when batteries charge and discharge, when generators run — against the utility rate structure to maximize the demand-charge savings. The financial model includes fuel, maintenance, and replacement reserves, because a microgrid is a 20-year asset. Every sizing assumption is documented for the utility interconnection review, which the microgrid must pass before it operates.
Controls, protection, and interconnection
The microgrid controller orchestrates everything: it watches the grid connection, manages the generation mix, executes islanding and resynchronization, and sheds non-critical loads if the islanded generation is ever exceeded. Protection is designed for two electrical worlds — grid-connected fault currents are high, islanded fault currents are low — and the relay settings handle both, which I verify with short-circuit studies in each mode. Grounding is designed for islanded operation, where the microgrid must establish its own ground reference. The utility interconnection agreement governs the grid-connected behavior: anti-islanding protection, power quality limits, and the utility's witness testing. I manage the interconnection process from application through commissioning, because utility timelines govern the project schedule.
Checklist before the microgrid goes live
Microgrid commissioning proves both modes. I test the islanding sequence by failing the grid connection under load, verify the critical loads transfer without interruption, run the islanded system through its paces, and prove resynchronization to the grid. Protection is tested in both modes, and the utility witnesses its required tests. Here is the checklist I hand resort operators.
- Build the critical load list for the winter-storm outage scenario — size for what must survive
- Provide N+1 firm generation plus batteries for bridging and daily peak shaving
- Design protection and grounding for both grid-connected and islanded electrical behavior
- Model the dispatch against utility rates to capture demand-charge savings continuously
- Prove islanding, islanded operation, and resynchronization under real load with utility witness
Which related engineering resources can help?
What else do project teams ask?
What loads does a ski resort microgrid serve?
How do batteries pay for themselves in a microgrid?
How does islanding work when the grid fails?
Can solar work at a ski resort?
Ready to discuss your engineering scope?
Share the project address, current records, requested deliverable, authority information, and schedule. Apex Grid confirms professional responsibility, availability, and scope before work begins.
Request a Project Review