Building microgrid design sizes on-site generation and battery storage to critical loads, engineers the switchgear for seamless islanding, and programs controls to optimize economics daily and resilience during outages.
I'm Jeremy Mills, CEO & Founder of Apex Grid Engineering and a U.S. Air Force veteran. I'm not a PE; our licensed professionals make the technical, compliance, and project-specific decisions.
The concise answer
Building microgrid design sizes on-site generation and battery storage to critical loads, engineers the switchgear for seamless islanding, and programs controls to optimize economics daily and resilience during outages. The electrical architecture centers on a microgrid switchgear lineup with an isolation device at the utility service, generation and storage connected through inverters, and a critical-loads distribution section that stays energized in island mode. The microgrid controller is the brain — monitoring grid status, dispatching batteries and generators, managing the transition, and optimizing against utility rates in normal operation. Protection coordination has to work in both grid-connected and islanded modes, which have very different fault current characteristics.
The engineering that decides success
Load analysis comes first and matters most — every load categorized, every critical load's profile understood across seasons and operating modes. Then the resource sizing: PV array sized to the site and the economics, battery sized to the islanding duration target and the demand-management value, generators sized to the critical load with fuel storage for the design outage. The controls sequence is where microgrids are won or lost. The transition to island mode has to be fast enough that critical loads never see it — typically requiring UPS-grade ride-through or fast static switching for sensitive loads. Black-start capability, generator staging, load shedding priorities, and re-synchronization to the grid all need engineered sequences, not defaults. I insist on factory and field testing of every transition scenario before acceptance.
Delivering a microgrid that performs
Microgrid projects stumble on interconnection timelines, vague load definitions, and untested controls. The ones that deliver treat the microgrid as an integrated system with a single point of design responsibility. What it takes.
- Define and categorize every load — critical, deferrable, sheddable — before sizing any equipment
- Engage the utility on interconnection requirements at project inception, not at permit
- Engineer protection for both grid-connected and islanded fault levels — they're very different
- Write and test complete transition sequences: islanding, black start, load shed, re-synchronization
- Model daily economics alongside resilience so the battery earns its keep between outages
Which related engineering resources can help?
What else do project teams ask?
What loads should a microgrid carry during an outage?
How long can a battery-backed microgrid run islanded?
Do microgrids save money when the grid is working?
What does the utility require for microgrid interconnection?