How Are Fleet EV Charging Load Studies Performed for Depots?
By Jeremy Mills, CEO & Founder, Apex Grid Engineering — USAF Veteran. · Updated 2026-09-15
Fleet charging load studies are performed from telematics and route data: per-vehicle daily energy, dwell-window analysis setting charger power levels, coincident demand modeling with managed charging against utility rates, and a phased roadmap — service size, charger count, utility plan, and budget — before vehicles are ordered.
I'm Jeremy Mills, CEO & Founder of Apex Grid Engineering and a U.S. Air Force veteran. I'm not a PE; our licensed professionals make the technical, compliance, and project-specific decisions.
From telematics to the energy model
The study starts with data collection: I gather the telematics exports, route manifests, and facility electrical records, then clean and analyze them into the per-vehicle energy picture. Each vehicle's daily kilowatt-hours, its dwell windows, and its dispatch deadlines become the inputs to the charging model. I validate the data against the fleet manager's experience — the numbers must match the operation's reality. The energy model then sizes the charging: the power level each vehicle's dwell window requires, the charger count by power level, and the phased rollout as vehicles electrify. Sensitivity analysis tests the assumptions: what if routes grow 10%, what if the vehicle efficiency disappoints. The model is delivered as a working tool, not just a report — the fleet manager reruns it as the plan evolves.
The roadmap: service, chargers, utility, budget
The study's deliverable is the phased electrification roadmap. I specify the ultimate electrical service size with the interim steps, the charger quantities and power levels by phase, and the site layout concept showing the buildout. The utility coordination plan lays out the application, the timeline, and the upgrades the service needs — with the lead times that govern the schedule. The budget covers the infrastructure, the chargers, the vehicles' incremental cost, and the operating economics with the rate modeling. I present the roadmap to the fleet's leadership with the decision points: the commitments each phase requires and the off-ramps if conditions change. The load study turns fleet electrification from a leap of faith into an engineered capital plan.
Checklist for a credible load study
A load study earns its keep through rigor. I verify the input data against operations, model the managed and unmanaged peaks transparently, and document every assumption. The utility engagement starts during the study, not after. Here is the checklist I hand fleet managers.
- Build the study from telematics and route data — real duty cycles, not assumptions
- Model per-vehicle energy, dwell windows, and the coincident demand with managed charging
- Identify the exception routes honestly and sequence the easy wins first
- Detail the utility rates, demand charges, and incentives in the operating economics
- Deliver a phased roadmap — service, chargers, utility plan, budget — as a working tool
Which related engineering resources can help?
What else do project teams ask?
What data does a fleet load study need?
How is the coincident peak calculated?
How does the study handle routes that don't fit depot charging?
How are utility rates modeled in the study?