Exhibit hall power uses a dense grid of heavy-duty floor boxes plus overhead bus duct, fed from separate show-power switchboards metered apart from house power — so every booth gets power within feet and exhibitor faults never touch building systems.
I'm Jeremy Mills, CEO & Founder of Apex Grid Engineering and a U.S. Air Force veteran. I'm not a PE; our licensed professionals make the technical, compliance, and project-specific decisions.
The floor box grid and show-power distribution
I lay out heavy-duty floor boxes on a tight module coordinated with the venue's booth plans, each fed from show-power panelboards around the hall perimeter through under-slab conduit or trenches. The panelboards carry generous spare breakers because exhibitor power orders always grow, and the feeders are sized for the coincident show peak — the morning the floor opens with every booth powered. Three-phase 208V is the workhorse; 480V is spotted for heavy demos. Every box is flush, traffic-rated, and locatable, because the best-planned grid fails if the show electrician cannot find the boxes under the carpet.
Separating show power from house power
Show power and house power diverge at the switchboard: separate services, separate metering, separate fault domains. The venue sells show power by the amp, so metering and capacity planning are commercial decisions as much as engineering ones — I size to the sales team's actual product mix, including the high-draw booths that anchor modern shows. Electrically, separation means an exhibitor fault trips a show breaker while the hall lights stay on, and building maintenance can de-energize house systems without touching a live show floor. The single-line diagram tells the story: two systems, one building, no shared failure modes.
Exhibit hall power checklist
An exhibit hall power design is ready when it clears this checklist. A show that opens on time, fully powered, is the deliverable. • Floor box grid on a tight module, traffic-rated, with power and data at every box • Show-power panelboards with spare breakers sized for the coincident exhibitor peak • 480V drops and overhead plug-in bus duct for heavy equipment demonstrations • Show power separately metered and electrically isolated from house power • Temporary distribution rules: qualified electricians, ground-fault protection, pre-open inspection
Which related engineering resources can help?
What else do project teams ask?
What is show power versus house power?
How close together should exhibit hall floor boxes be?
How do heavy equipment demos get power on the show floor?
Who is allowed to connect power on a trade show floor?
Ready to discuss your engineering scope?