Commercial solar PV engineering has two halves: structural analysis proving the roof supports the array's weight, wind, and seismic loads, and electrical design for the DC strings, inverters, AC interconnection, and utility requirements. The structural deliverable is typically a stamped letter or calculation package verifying capacity and attachment design. The electrical design covers string sizing, inverter placement, conductor and conduit routing, disconnects, rapid shutdown, and the point of interconnection with the building service and the utility.

I'm Jeremy Mills, CEO & Founder of Apex Grid Engineering and a U.S. Air Force veteran. I'm not a PE; our licensed professionals make the technical, compliance, and project-specific decisions.

Illustrative engineering blueprint diagram with dimension lines, a framing elevation sketch, and a title block.

The concise answer

Commercial solar PV engineering has two halves: structural analysis proving the roof supports the array's weight, wind, and seismic loads, and electrical design for the DC strings, inverters, AC interconnection, and utility requirements. The structural deliverable is typically a stamped letter or calculation package verifying capacity and attachment design. The electrical design covers string sizing, inverter placement, conductor and conduit routing, disconnects, rapid shutdown, and the point of interconnection with the building service and the utility. The sequencing matters: structural feasibility comes first, because there's no point designing the electrical interconnection for an array the roof can't carry. I verify the roof, lock the array layout with the installer, then engineer the electrical. Owners who buy the panels before the structural check are gambling — occasionally they win, and when they lose it's expensive.

Structural: the roof has to prove itself

The structural analysis starts with what the roof is: framing type, span, deck, and age, from the original drawings or a field investigation when drawings don't exist. Against that capacity I check the array's demands — the distributed dead load of panels, racking, and ballast; concentrated loads at attachments or ballast points; wind pressures on the tilted array including uplift, which on low-slope roofs with tilted panels can be the controlling load; and seismic forces on the equipment. Attachment design gets the same rigor as the global check. Penetrating attachments need flashing and structural connection to framing, not just the deck; ballasted systems need verified friction and wind resistance without penetrations. I also check the roof's drainage — arrays change how water moves across a roof, and ponding under ballast is a slow-motion structural and waterproofing problem. The stamped letter at the end is only as good as this analysis, so I do the analysis.

Electrical: from the roof to the grid

The electrical design turns the array layout into a working power system. String design groups panels into series strings matched to the inverter's voltage windows; inverter selection and placement balances efficiency against conduit runs and service room space. Conductor sizing accounts for the rooftop temperature environment, voltage drop over long runs matters at these low voltages, and the DC and AC disconnects, overcurrent protection, and grounding follow the electrical code's solar articles. Rapid shutdown requirements shape the roof layout — the code limits how quickly and to what level the array de-energizes for firefighter safety, which drives module-level electronics or string-level solutions the design must accommodate. Then the interconnection: the point where the PV system meets the building service, with utility-required disconnects, metering, and protection. I produce the one-line diagram the utility reviews, and I stay in the loop until the interconnection agreement is signed — because an engineered system without utility permission to operate is just expensive roof decoration.

  • Structural verification: dead load, wind uplift, seismic, and attachment design
  • Stamped structural letter or calculation package for the permit
  • String design, inverter selection, and conductor routing for the DC/AC system
  • Rapid shutdown compliance integrated into the roof layout
  • Utility interconnection one-line diagram and application support

What else do project teams ask?

Will my roof support solar panels?
Often yes, but it has to be verified — never assumed. I review the existing structural drawings, confirm the roof framing and deck capacity, and check the specific array layout against it, including wind uplift which frequently controls over the panel weight itself. Older roofs, lightweight decks, and roofs with existing equipment congestion get extra scrutiny. If capacity is short, the options are a lighter ballasted layout, structural reinforcement, or a smaller array.
What is a structural letter for solar?
It's a stamped engineering letter stating that the existing roof structure can support the proposed PV array under the applicable code loads. It summarizes the analysis — gravity, wind, seismic — and references the calculation package behind it. Jurisdictions and installers routinely require it with the permit application. I issue them only after a real analysis, because the stamp means I've verified the capacity, not just eyeballed it.
Who handles the utility interconnection?
The interconnection application goes to the serving utility, and it's a separate process from the building permit with its own timeline and technical requirements. The electrical engineer provides the one-line diagram, inverter specifications, and interconnection details the utility requires. I advise owners to start the utility application early — interconnection review and any required service upgrades are a common source of project delay.
What should I send for an initial review?
Send the project address, plain-language scope, current drawings, existing-condition records, relevant calculations or comments, schedule, and the authority or code information already available. Existing roof structural drawings and the proposed array layout are the key inputs. The responsible engineer will identify gaps.

Ready to discuss your engineering scope?

Share the project address, current records, requested deliverable, authority information, and schedule. Apex Grid confirms professional responsibility, availability, and scope before work begins.

Request a Project Review

Get a quote on your project

Reviewed and sealed by licensed PEs. “Solid engineering and clear communication from start to finish.” — Jason Mitchell, Principal Architect

Tell us what you need and where the project is — quotes back within 12–24 hours on qualifying scopes.