Do I need a structural letter for solar panels?

A structural letter for solar panels should identify the roof or supporting structure reviewed, the photovoltaic equipment and attachment or ballast system, applicable load inputs, observed or documented conditions, analysis performed, and limitations. A letter is appropriate only when its defined scope gives the responsible engineer enough evidence to support the stated conclusion; it is not a universal shortcut to a seal or approval.

By Jeremy Mills, CEO & Founder, Apex Grid Engineering — USAF Veteran · Updated 2026-09-15

I'm Jeremy Mills, CEO & Founder of Apex Grid Engineering and a U.S. Air Force veteran. Apex Grid is veteran-owned; I'm not a PE, and this perspective does not replace the responsible engineer's judgment.

Identify the roof and solar system

The review needs more than a panel count. I look for the module and rail layout, attachment spacing, ballast weights, inverter and equipment locations, roof zones, existing framing, roof age or condition, and proposed installation method so the responsible engineer can identify the loads and connections that require review.

  • Current roof plan, framing plan, and equipment layout
  • Panel, rail, attachment, ballast, and manufacturer data
  • Roof sheathing, joists or rafters, beams, trusses, and support lines
  • Existing rooftop equipment, penetrations, repairs, and access conditions

Evaluate added and redistributed forces

Solar arrays can add dead load and create uplift, sliding, attachment, concentrated, maintenance, or equipment forces. The engineer traces those forces through fasteners or ballast, roof sheathing and framing, connections, and foundations or other supports while accounting for the actual roof geometry and design criteria.

  • Dead load, uplift, lateral, seismic, and attachment forces as applicable
  • Local sheathing and member capacity at attachment points
  • Load distribution, transfers, blocking, and connection details
  • Roof condition and water-intrusion risks outside the structural calculation

State what the letter does and does not say

A letter should distinguish observation from analysis, identify records relied upon, state exclusions, and avoid conclusions broader than the reviewed system. Electrical interconnection, fire, roofing, utility, and authority requirements may need separate review; the letter cannot promise an agency decision.

  • Date, address, system description, and documents reviewed
  • Analysis methods, assumptions, field observations, and unresolved limitations
  • Defined conclusion tied to the reviewed array and supporting structure
  • Separate responsibility for electrical, roofing, fire, utility, and permit decisions

Frequently Asked Questions

Can a panel count support a structural letter?
No. The engineer typically needs the array layout, attachment or ballast information, roof framing and condition records, equipment data, and project-specific load criteria before defining a responsible conclusion.
Does a structural solar letter cover electrical approval?
No. A structural letter addresses its defined structural scope. Electrical design, interconnection, roofing, fire, utility, and authority requirements remain separate matters unless explicitly assigned to qualified professionals.
Is a site visit always required for rooftop solar review?
Not always. Reliable drawings, photographs, measurements, and installation records may support some reviews, while uncertain framing, roof condition, concealed attachments, or high-consequence conditions can require direct observation. The responsible engineer decides.
Does a solar structural letter guarantee permit acceptance?
No. The authority controls its submission checklist, interpretation, review, and decision. The letter should state its evidence, scope, and limitations clearly.

Discuss your engineering scope

Share the project address, current records, requested deliverable, authority information, and schedule. Apex Grid confirms professional responsibility, availability, and scope before work begins.

Start an Engineering Estimate