Rental backup power is sized by sorting loads into critical, important, and sheddable — gates, fueling electronics, security, and life safety first — with the generator sized for starting currents and an automatic transfer switch restoring power in seconds.
I'm Jeremy Mills, CEO & Founder of Apex Grid Engineering and a U.S. Air Force veteran. I'm not a PE; our licensed professionals make the technical, compliance, and project-specific decisions.
Sorting loads and sizing the machine
The load list is built circuit by circuit: every panel, every major load, tagged critical, important, or sheddable with the owner's sign-off. The generator is sized for the critical and important loads with their demand factors, then verified against the worst motor-starting sequence — I stage the starts in the design so the generator never sees everything inrush at once. Voltage dip during starting is checked against the equipment tolerances, because the access control system does not care that the generator is big enough if the voltage sag reboots it. The sizing calculation is the document the reviewer and the owner both read.
Transfer switches, distribution, and code
The automatic transfer switch is the brain: utility sensing, generator start signal, transfer on stable generator power, retransfer on stable utility, and engine cooldown. The emergency distribution is kept entirely separate from the normal distribution — separate panels, separate conduit — per the electrical code's requirements for emergency systems. Selective coordination of the breakers keeps a fault on one emergency branch from taking down the whole emergency system. The one-line diagram shows normal power, generator power, and the transfer switch in one view, because the inspector, the electrician, and the owner all need to understand it at a glance.
Backup power design checklist
A rental backup-power design is ready when it clears this checklist. The outage will come; the design decides what happens next. • Loads sorted critical, important, sheddable with owner sign-off; generator sized for starting currents • Automatic transfer switch with tested transfer, retransfer, and cooldown sequence • Fuel storage for the documented runtime; ventilation, exhaust, and sound attenuation designed • Emergency distribution separated from normal per code, with selective coordination • Load-bank and transfer commissioning proving the system carries the design loads
Which related engineering resources can help?
What else do project teams ask?
Which rental loads must be on the generator?
How long should the generator fuel supply last?
What does generator commissioning involve?
Do generators need sound attenuation at rental lots?
Ready to discuss your engineering scope?
Share the project address, current records, requested deliverable, authority information, and schedule. Apex Grid confirms professional responsibility, availability, and scope before work begins.
Request a Project Review