Rental backup power is sized by sorting loads into critical, important, and sheddable — gates, fueling electronics, security, and life safety first — with the generator sized for starting currents and an automatic transfer switch restoring power in seconds.

I'm Jeremy Mills, CEO & Founder of Apex Grid Engineering and a U.S. Air Force veteran. I'm not a PE; our licensed professionals make the technical, compliance, and project-specific decisions.

Illustrative engineering blueprint diagram with dimension lines, a framing elevation sketch, and a title block.

Sorting loads and sizing the machine

The load list is built circuit by circuit: every panel, every major load, tagged critical, important, or sheddable with the owner's sign-off. The generator is sized for the critical and important loads with their demand factors, then verified against the worst motor-starting sequence — I stage the starts in the design so the generator never sees everything inrush at once. Voltage dip during starting is checked against the equipment tolerances, because the access control system does not care that the generator is big enough if the voltage sag reboots it. The sizing calculation is the document the reviewer and the owner both read.

Transfer switches, distribution, and code

The automatic transfer switch is the brain: utility sensing, generator start signal, transfer on stable generator power, retransfer on stable utility, and engine cooldown. The emergency distribution is kept entirely separate from the normal distribution — separate panels, separate conduit — per the electrical code's requirements for emergency systems. Selective coordination of the breakers keeps a fault on one emergency branch from taking down the whole emergency system. The one-line diagram shows normal power, generator power, and the transfer switch in one view, because the inspector, the electrician, and the owner all need to understand it at a glance.

Backup power design checklist

A rental backup-power design is ready when it clears this checklist. The outage will come; the design decides what happens next. • Loads sorted critical, important, sheddable with owner sign-off; generator sized for starting currents • Automatic transfer switch with tested transfer, retransfer, and cooldown sequence • Fuel storage for the documented runtime; ventilation, exhaust, and sound attenuation designed • Emergency distribution separated from normal per code, with selective coordination • Load-bank and transfer commissioning proving the system carries the design loads

What else do project teams ask?

Which rental loads must be on the generator?
Whatever keeps the fleet moving and people safe: gate operators and access control so cars can enter and exit, the fuel management system so the island can dispense, emergency and egress lighting, the fire alarm panel, the security cameras and head-end, and the counter's point-of-sale and network so rentals can still be processed. Lot lighting usually makes the list for security. The car wash, shop compressors, and general HVAC are typically sheddable. I walk the owner through the sort load by load, because the generator size — and cost — follows directly from what makes the cut.
How long should the generator fuel supply last?
Long enough to ride out the credible outage. For a rental operation, I typically design for 24 to 72 hours of runtime at the expected load — enough for a major storm outage without a fuel delivery. Diesel is the standard choice for this size range, with the sub-base or remote tank sized for the runtime and the fuel polishing and testing plan in the maintenance manual. Natural gas avoids the fuel-storage question but depends on the gas utility staying up, which is not assured in every disaster. The runtime decision is documented with the owner, because fuel storage is real money and real space.
What does generator commissioning involve?
Proving the system does what the design says. The commissioning includes a load-bank test running the generator at full rated load to verify capacity and cooling, an automatic transfer test simulating a utility failure to verify the switch timing and sequence, and a test of every emergency load actually transferring and running. I also verify the alarms and monitoring — the generator must report its status to the building system or the owner's phone, because a generator that fails silently is a decoration. The test reports go into the closeout documents.
Do generators need sound attenuation at rental lots?
Usually yes, at least to a point. Rental facilities often sit near hotels, residences, or the airport terminal — neighbors who will hear a 500-kW diesel at 2 a.m. during the weekly exercise cycle. I specify the enclosure and exhaust silencer for the site's noise ordinance and the neighbors' reality, and I schedule the exercise cycle for daytime. The exercise run is non-negotiable for reliability — a generator that never runs is a generator that will not start — so the design makes the weekly test as quiet and as brief as the reliability standards allow.

Ready to discuss your engineering scope?

Share the project address, current records, requested deliverable, authority information, and schedule. Apex Grid confirms professional responsibility, availability, and scope before work begins.

Request a Project Review

Get a quote on your project

Reviewed and sealed by licensed PEs. “Solid engineering and clear communication from start to finish.” — Jason Mitchell, Principal Architect

Tell us what you need and where the project is — quotes back within 12–24 hours on qualifying scopes.