Commercial Office · Nashville, TN · 2023
Cumberland Forge Corporate Center
Core-and-shell engineering for a Class A office campus, with tenant-ready MEP infrastructure designed for flexible floor-plate demising. Right-sized central plant capacity, vertical distribution planned around future tenant improvements, and structural framing optimized for open floor plates and rooftop amenity loads.
Portfolio record
This case study is based on the published Apex Grid portfolio record for Cumberland Forge Corporate Center. It does not add project facts beyond that record.
Core-and-shell engineering for a Class A office campus, with tenant-ready MEP infrastructure designed for flexible floor-plate demising. Right-sized central plant capacity, vertical distribution planned around future tenant improvements, and structural framing optimized for open floor plates and rooftop amenity loads.
My founder perspective
I base this perspective on the published portfolio record. I read Cumberland Forge through flexibility. The published record pairs open floor plates and rooftop amenity loads with tenant-ready MEP, future tenant improvements, and a right-sized central plant, so my perspective is to preserve options without losing a clear core-and-shell baseline.
Disciplines: MEP, Structural.