Mission Critical / Industrial · Ashburn, VA · 2023

Bluewire Data Campus

Mission-critical MEP design featuring N+1 redundancy, advanced cooling distribution, and pre-action fire suppression systems. The facility demanded highly reliable electrical distribution to support extreme rack densities, alongside massive backup generator arrays seamlessly integrated into the structural envelope.

Bluewire Data Campus engineering project

Portfolio record

This case study is based on the published Apex Grid portfolio record for Bluewire Data Campus. It does not add project facts beyond that record.

Mission-critical MEP design featuring N+1 redundancy, advanced cooling distribution, and pre-action fire suppression systems. The facility demanded highly reliable electrical distribution to support extreme rack densities, alongside massive backup generator arrays seamlessly integrated into the structural envelope.

My founder perspective

I base this perspective on the published portfolio record. I read the Bluewire record as a reliability and coordination exercise. N+1 redundancy, cooling distribution, electrical distribution, rack density, fire suppression, and generator arrays are all named in the record, so my perspective is to keep those interfaces explicit in the design conversation.

Power
32 MW
Density
250 W/sq ft
Uptime
Tier III

Disciplines: MEP, Fire Protection.

Frequently Asked Questions

What type of facility is Bluewire Data Campus?
It is described as a mission-critical / industrial facility in Ashburn, Virginia.
What redundancy was included?
The mission-critical MEP design featured N+1 redundancy.
How was fire protection handled?
The design included pre-action fire suppression systems.
What electrical challenge did the facility have?
It required highly reliable electrical distribution to support extreme rack densities, with massive backup generator arrays integrated into the structural envelope.