Irving, TX · Licensed Professional Engineering
Site engineering that clears local review — grading, drainage, and utilities designed to each jurisdiction's published standards from day one.
Irving site engineering addresses clay-sensitive paving, detention, grading, and municipal water/wastewater capacity. Floodplain and drainage review, erosion controls, and TCEQ construction-stormwater coverage are resolved with the city before final civil documents.
Code adoptions and local amendments change on multi-year cycles. The state source verification date is 2026-07-28; we verify the governing editions with City of Irving Building Inspection Division at project kickoff.
Commercial permits and plan documents are submitted through the City of Irving's online permitting system; Building Inspection coordinates building, fire, and trade review. Projects must also address zoning, site, and civil approvals before construction.
Irving adopts a municipal construction-code package rather than Dallas's amendments. Local fire, zoning, accessibility, and floodplain requirements are reviewed with the building permit.
Oncor controls delivery service, meters, upgrades, and interconnection in ERCOT; Irving water and wastewater service is provided by the City of Irving.
Las Colinas, the DFW Airport area, and the western Dallas employment corridor support office, hospitality, data-center, logistics, and mixed-use construction. Airport-adjacent height, noise, and transportation coordination can affect otherwise conventional commercial sites.
Reviewed 2026-09-11. Code editions and local requirements can change; confirm the current requirements with the authority having jurisdiction before design.
With a team of licensed PEs and a multi-discipline engineering team, we're ready to take on projects of any size — and we turn quotes around fast. Send us your scope and get a clear proposal: deliverables, timeline, and fee.
Request a Proposal