The most common engineering delays are not caused by the engineer — they come from incomplete information at project start, architectural changes during engineering, late equipment selections, unavailable existing drawings, and permit review cycles that exceed schedule assumptions. Understanding what causes delays helps project teams plan realistically and avoid the most common schedule traps.