A geotechnical investigation and report typically takes three to six weeks from notice to proceed. The timeline includes drilling mobilization and scheduling, field investigation, laboratory testing, and report production. Rush geotechnical investigations are sometimes possible but depend on drilling contractor availability and laboratory capacity.