Structural engineering letters and engineer-of-record transition support are available when an existing-building question needs documented responsibility.
Existing Building · Floor Framing
Before adding heavy equipment, mezzanines, elevated storage, or occupancy changes, existing floor framing must be evaluated for structural capacity. Engineering assessment determines whether the existing floor system can support proposed loads — or identifies what reinforcement is required.
A condition assessment documents the current state of a building's structural system or MEP systems — identifying defici…
A large percentage of existing building projects have no drawings on file. Engineers work through this all the time — us…
Field verification collects the physical data about an existing building that engineering design depends on — member siz…
When contractors provide high-quality field documentation — photographs, measured dimensions, framing member sizes from …
Send us what you have — drawings, photos, or just a description. We'll tell you what engineering is needed and how much it costs. Fast quotes, no runaround.
Request a Proposal