How Much Does Title 24 Compliance Cost and How Long Does It Take?

By Jeremy Mills, CEO & Founder, Apex Grid Engineering — USAF Veteran. · Updated 2026-09-15

Title 24 compliance cost and timing depend on building type, project scope, prescriptive versus performance analysis, model complexity, available design information, required forms, and review cycles. A focused package with complete inputs can move quickly; incomplete drawings, late equipment changes, performance modeling, plan-check revisions, HERS verification, or acceptance testing extend both engineering effort and total schedule.

I'm Jeremy Mills, CEO & Founder of Apex Grid Engineering and a U.S. Air Force veteran. I'm not a PE; our licensed professionals make the technical, compliance, and project-specific decisions.

What facts should you use to plan this scope?

Planning factProject-specific value
State fee scheduleNone; professional fees are scope-specific
Code-cycle checkpointPermit application date determines whether the 2022 or 2025 Energy Code applies
Design schedule componentsInput review, calculations or model, forms, drawing coordination, quality control, and submittal
External schedule componentsAHJ intake and review, contractor installation, HERS verification, acceptance testing, and closeout

What determines the engineering fee for Title 24 compliance?

I do not treat Title 24 as a flat form-filling charge. A small alteration with settled assemblies and equipment is different from a new commercial building with multiple space types, complex glazing, lighting controls, HVAC systems, and performance tradeoffs. The proposal should state the code cycle, building scope, compliance method, required certificates, drawing coordination, included model iterations, plan-check responses, and construction-phase services.

  • Building type, conditioned area, occupancy, and alteration scope
  • Envelope, lighting, HVAC, controls, service water heating, and covered processes
  • Prescriptive documentation versus whole-building performance modeling
  • Number of alternatives, revisions, submissions, and construction changes

How long does design-phase compliance usually take?

A useful schedule starts only after the necessary inputs are available. Focused prescriptive documentation can take less effort than a whole-building performance model, but neither should be promised before reviewing the project. Modeling may require geometry setup, zoning, schedules, assemblies, system definitions, proposed-versus-standard comparison, and design revisions. I separate that production period from the jurisdiction's intake and plan-check queue, which the consultant does not control.

  • Set an input-complete milestone before starting the production clock
  • Identify who supplies envelope, lighting, mechanical, and controls data
  • Reserve time for internal quality control and drawing coordination
  • Track agency review and consultant response as separate schedule periods

Why do plan check and construction change the timeline?

A plan-check comment can require clarification, corrected inputs, revised forms, or changes across drawings and calculations. During procurement, a substituted rooftop unit, glazing product, water heater, luminaire, or control sequence can affect the compliance basis. Residential HERS measures and nonresidential acceptance tests also depend on installed systems and qualified field participants. Late scheduling or failed tests can delay closeout even when the original permit analysis was timely.

  • Budget for at least the review cycles expressly included in the proposal
  • Require energy-impacting substitutions to be reviewed before installation
  • Schedule raters and acceptance-test technicians early
  • Distinguish permit issuance from final compliance closeout

What information produces the most reliable cost and schedule?

For an estimate, I ask for the address, jurisdiction, permit date target, occupancy, floor area, project narrative, architectural drawings, envelope assemblies, lighting plans and controls, mechanical schedules, service-water-heating information, and any prior compliance files or comments. A proposal based on actual inputs can identify exclusions and decision dates; a generic price cannot reveal whether the design is ready to model.

  • Current architectural and engineering backgrounds
  • Window, wall, roof, lighting, HVAC, and water-heating selections
  • Owner performance goals and alternatives requiring study
  • Permit milestones, procurement dates, and known agency comments

What else do project teams ask?

Is there a standard price for a Title 24 report?
No. California does not set a universal professional fee. Building type, scope, method, complexity, inputs, deliverables, revisions, and construction-phase services determine the work.
Can Title 24 compliance be completed in one day?
A limited, complete scope may move quickly, but no responsible schedule should be promised before the inputs, code cycle, method, forms, and coordination requirements are reviewed.
Does the fee include plan-check responses?
Only if the proposal says so. It should state the included review cycles and how owner changes, redesign, substitutions, or comments outside the original scope are handled.
Are HERS and acceptance-testing fees included?
Not automatically. Field verification and acceptance testing may be contracted separately from design compliance services. The proposal should identify who retains and pays each participant.
What causes the most avoidable delay?
Incomplete inputs, inconsistent drawings, late equipment selections, unreviewed substitutions, missed registration requirements, and field testing scheduled after systems become inaccessible commonly create rework.