Thermal bridges are located by auditing every structural and cladding element that penetrates the insulation layer, then mitigated with manufactured thermal breaks (e.g., at balconies and parapets), continuous insulation over the bridge, or thermally broken connection redesign. Beyond energy loss, bridges cause interior cold spots, condensation, and mold — mitigation is both an energy and a durability measure.

I'm Jeremy Mills, CEO & Founder of Apex Grid Engineering and a U.S. Air Force veteran. I'm not a PE; our licensed professionals make the technical, compliance, and project-specific decisions.

Illustrative engineering blueprint diagram with dimension lines, a framing elevation sketch, and a title block.

The concise answer

Thermal bridges are located by auditing every structural and cladding element that penetrates the insulation layer, then mitigated with manufactured thermal breaks (e.g., at balconies and parapets), continuous insulation over the bridge, or thermally broken connection redesign. Beyond energy loss, bridges cause interior cold spots, condensation, and mold — mitigation is both an energy and a durability measure. The energy angle gets the attention, but the durability angle should: a thermal bridge is a future mold location drawn into the building's details. Owners rarely complain about the heating bill with the specificity they complain about mold. I mitigate bridges for both reasons and lead with the one the owner will actually see.

The bridge audit: where to look

I audit bridges systematically at the detail level, because that is where they hide. The floor-line slab edge gets checked in every wall section. Balconies and canopies get a decision: thermal break, self-supporting structure, or acceptance of the bridge with CI mitigation. Parapets get evaluated for whether the roofing insulation can wrap them or a break is needed. Cladding support systems get reviewed for their conductivity — a continuous steel angle is a bridge; isolated clips at spacing are a much smaller one. Penetrations get the same treatment: structural steel passing through the envelope, rooftop equipment curbs, and piping supports. Each one is small, but buildings have hundreds of them, and the aggregate matters. The audit is a drawing review exercise — I trace the insulation plane through every detail and mark everywhere something conductive crosses it.

Mitigation strategies in priority order

Not every bridge justifies a manufactured thermal break. I work through the options from cheapest to most engineered. My mitigation hierarchy:

  • Eliminate: redesign the connection so nothing conductive crosses the insulation — self-supporting balconies, isolated parapets
  • Break: manufactured thermal break elements where structure must penetrate — balconies, canopies, critical slab edges
  • Cover: continuous insulation over the bridge where elimination is impractical — slab edges, shelf angles, clip systems
  • Verify: interior surface temperatures checked against dew point for every significant remaining bridge
  • Document: the bridge strategy recorded so energy modeling reflects the as-detailed assembly, not an idealized one

What else do project teams ask?

What are the most common thermal bridges in buildings?
Concrete slab edges at floor lines, balconies cantilevered from the slab, parapets, steel shelf angles supporting masonry, metal cladding clip and rail systems, and structural penetrations like beams passing through walls. Slab edges are the classic: a concrete slab is a highly conductive fin running from inside to outside at every floor, and without a thermal break or exterior CI cover, it bleeds heat continuously along the building's entire perimeter.
What is a structural thermal break?
A manufactured element — typically stainless steel tension and compression modules separated by insulation — that carries structural loads across the insulation layer while blocking heat flow. They are used at balconies, canopies, parapets, and slab edges where the structure must penetrate the thermal envelope. They cost real money, which is why I reserve them for the bridges that matter most and handle the rest with CI coverage or connection redesign.
Can you just add more insulation to fix thermal bridging?
Adding cavity insulation does almost nothing for a bridge — the bridge bypasses the cavity entirely. Covering the bridge with continuous insulation on the exterior works because it insulates the conductive element itself. The hierarchy is: eliminate the penetration if possible, break it with a thermal break element, or cover it with CI. More insulation in the wrong place is just more insulation in the wrong place.
Do thermal bridges cause condensation?
Yes — that is often how they are discovered. The bridge cools the interior surface below the dew point of the indoor air, and moisture condenses on the cold spot: the classic stripe of mold along a slab edge or the damp patch at a steel connection. I treat every significant bridge as a condensation risk and verify interior surface temperatures against expected indoor humidity, not just energy performance.

Ready to discuss your engineering scope?

Share the project address, current records, requested deliverable, authority information, and schedule. Apex Grid confirms professional responsibility, availability, and scope before work begins.

Request a Project Review

Get a quote on your project

Reviewed and sealed by licensed PEs. “Solid engineering and clear communication from start to finish.” — Jason Mitchell, Principal Architect

Tell us what you need and where the project is — quotes back within 12–24 hours on qualifying scopes.