T-hangar power is engineered as a house service sized for the row's coincident load, with per-unit panels, metering, lighting, and door-operator circuits, every fire-separation penetration firestopped, and grounding and lightning protection continuous across the long steel structure.
I'm Jeremy Mills, CEO & Founder of Apex Grid Engineering and a U.S. Air Force veteran. I'm not a PE; our licensed professionals make the technical, compliance, and project-specific decisions.
Service Sizing and Per-Unit Distribution
The engineer builds the load calculation from the unit template multiplied across the row: lighting, door operator, receptacles, and any unit heat, with demand factors reflecting that not every unit peaks together. The service and main distribution are sized for this coincident load plus documented spare capacity, and the feeder routing along the row is checked for voltage drop to the farthest unit. Each unit's panel is located for owner access with working clearances maintained, and the branch design keeps the unit self-sufficient — lighting, receptacles, and door on the unit's own breakers. Common-area loads (row lighting, security, any shared equipment) are kept on house panels separate from tenant billing, which keeps the metering honest and the maintenance responsibility clear.
Fire Separation, Grounding, and Maintainability
The rated separations between units are the life-safety backbone of a T-hangar row, and the electrical design must not compromise them: every conduit, cable tray, and box penetrating a separation gets the listed firestop assembly for that construction, shown in the details and verified in the field. The engineer avoids running one unit's circuits through another unit's space wherever possible, because it creates both a fire-separation problem and a maintenance access problem. Grounding runs continuous along the row — grounding electrode conductors, steel bonding, and lightning protection down conductors tied into one system per NFPA 780, since a long steel building in open terrain is a lightning target. Maintainability is designed in: house panels, meters, and contactors grouped in an electrical room or weatherproof lineup accessible without entering leased units, with labeling that maps every circuit to its unit.
T-Hangar Power Design Checklist
Use this checklist before the T-hangar electrical drawings are finalized: • House service sized for the row's coincident load with demand factors and documented spare capacity • Voltage drop checked to the farthest unit under peak door-operator and lighting load • Per-unit panel or disconnect with individual overcurrent protection; metering or submetering per unit • Per-unit LED lighting on owner control; GFCI receptacles placed for chargers and portable tools • Door operators on dedicated circuits with required disconnecting means • Every fire-separation penetration detailed with listed firestop assemblies; circuits kept out of adjacent units • Continuous grounding and NFPA 780 lightning protection bonded across the full row • Common equipment grouped for access without entering tenant units; every circuit labeled to its unit
Which related engineering resources can help?
What else do project teams ask?
Does each T-hangar unit need its own electric meter?
What electrical load does a typical T-hangar unit need?
Why is firestopping such a big deal in T-hangar rows?
How is lightning protection handled for a long hangar row?
Ready to discuss your engineering scope?
Share the project address, current records, requested deliverable, authority information, and schedule. Apex Grid confirms professional responsibility, availability, and scope before work begins.
Request a Project Review