AEO Answer · Civil & Site Engineering
Stormwater Detention vs Retention: Which Does Your Site Need?
By Jeremy Mills, CEO & Founder, Apex Grid Engineering — USAF Veteran. · Updated 2026-09-15
Detention temporarily stores stormwater and releases it at pre-development rates through a controlled outlet; retention holds it permanently on site for infiltration. The choice depends on local drainage criteria, soil infiltration capacity, and what the downstream system can accept.
I'm Jeremy Mills, CEO & Founder of Apex Grid Engineering and a U.S. Air Force veteran. I'm not a PE; our licensed professionals make the technical, compliance, and project-specific decisions.
How the outlet structure controls everything
In a detention design, the outlet structure is the design. I size orifices and weirs to produce the release-rate hydrograph the drainage report commits to, stage by stage: a small low-flow orifice handles the frequent storms, and a riser or weir takes over as the water rises. A trash rack protects every opening, because one branch across the orifice changes the basin's performance. The emergency spillway — broad-crested, armored — handles anything beyond the design storm so the embankment never overtops. I model the stage-storage-discharge curve for the as-built geometry, not an idealized shape, since grading tolerance changes the numbers. The most common failure I see is outlet undersizing driven by available head: on flat sites there is not enough elevation difference to push the design flow through the orifice, so the basin ponds longer than intended. On those sites I either buy head by deepening the basin or accept a longer drawdown with agency approval. Either way, the outlet hydraulics get designed to the site's actual elevations.
Retention design and infiltration verification
Retention lives or dies on field-verified infiltration. I require percolation testing at the basin's proposed bottom elevation — not at the surface, which tells me nothing — plus a seasonal high groundwater determination, because the required separation between the basin floor and the water table is an agency criterion, not a suggestion. The design storm volume must infiltrate within the drawdown window using a factored infiltration rate, with the safety factor accounting for long-term soil clogging. A basin that works on paper with unfactored rates is a pond in year five. Pretreatment is what keeps retention working. A forebay or sediment trap upstream of the infiltration area captures the fines that would otherwise seal the soil surface. I make the forebay accessible to a small excavator, because a forebay that cannot be cleaned out is just a delayed failure. In jurisdictions with aquifer protection rules, I also confirm that the proposed land use is allowed to infiltrate at all — fueling areas and certain industrial uses may be required to use lined detention instead.
Detention vs retention selection checklist
The detention-retention decision is locked when these questions are answered. I resolve them before the grading plan advances, because the answer changes the earthwork, the landscape plan, and the maintenance agreement. • What release rates and drawdown times does the drainage criteria manual require • Field percolation rate at basin invert and seasonal high groundwater separation • Whether the receiving system is a piped network (favors detention) or open channel (may favor retention) • Available head for a gravity outlet — flat sites constrain detention hydraulics • Land-use restrictions on infiltration near fueling, industrial, or contaminated areas
Which related engineering resources can help?
What else do project teams ask?
Can a basin be both detention and retention?
How long does a detention basin take to drain after a storm?
What maintenance does a detention basin actually need?
Why won't my jurisdiction approve a retention basin on my site?
Ready to discuss your engineering scope?
Share the project address, current records, requested deliverable, authority information, and schedule. Apex Grid confirms professional responsibility, availability, and scope before work begins.
Request a Project Review