Solid-waste stormwater design separates clean runoff from contact water with physical grading, contains the contact stream in tanks or lined ponds, and treats or hauls it to a permitted outlet.
I'm Jeremy Mills, CEO & Founder of Apex Grid Engineering and a U.S. Air Force veteran. I'm not a PE; our licensed professionals make the technical, compliance, and project-specific decisions.
Clean and contact drainage areas
The drainage design starts with the site map divided by use: every area is classified as clean or contact, and the grading enforces it. Clean areas get the standard stormwater design — inlets, piping, detention, and water-quality treatment sized for the jurisdiction's requirements. Contact areas — tipping floors and aprons, process pads, stockpiles, the maintenance yard, fueling — are graded inward to collection with berms and curbs at every boundary so clean runoff cannot run onto them and contact water cannot run off. The design checks the separation in the grading plan itself: if the contours do not show it, the separation does not exist.
Containment, treatment, and the big storm
Contact-water containment is sized for the design storm on the contact areas plus the daily generation — tanks with secondary containment or lined ponds with the freeboard the permit requires. Treatment follows the permit: sedimentation for the fines, oil-water separation at the fueling and maintenance areas, and whatever additional treatment the discharge limits demand; where no discharge is permitted, the design provides the storage and the loadout for hauling. The stormwater pollution prevention plan is built from the design — the controls, the inspection schedule, and the sampling points the permit requires. And the design proves the containment holds through the design storm, because the violation happens when the system overflows.
Solid waste stormwater checklist
A solid waste site stays compliant when clean and contact water never meet. The grading plan is the compliance plan. • Site divided into clean and contact drainage areas with physical separation • Contact areas graded to contained collection with berms and curbs at boundaries • Containment sized for the design storm plus daily contact-water generation • Treatment or hauling designed to the discharge permit's limits • Pollution prevention plan with inspections and sampling built from the design
Which related engineering resources can help?
What else do project teams ask?
What is contact water at a solid waste facility?
How do you keep clean and contact water separated?
What treatment does contact water need?
What is a stormwater pollution prevention plan?
Ready to discuss your engineering scope?
Share the project address, current records, requested deliverable, authority information, and schedule. Apex Grid confirms professional responsibility, availability, and scope before work begins.
Start an Engineering Estimate