How Are 34.5kV Medium-Voltage Collection Systems Designed?
By Jeremy Mills, CEO & Founder, Apex Grid Engineering — USAF Veteran. · Updated 2026-09-15
A 34.5 kV collection system links each inverter station to the substation through sized, derated circuits that hold voltage drop within limits, with sectionalizing and coordinated protection so one fault cannot darken the whole plant.
I'm Jeremy Mills, CEO & Founder of Apex Grid Engineering and a U.S. Air Force veteran. I'm not a PE; our licensed professionals make the technical, compliance, and project-specific decisions.
Cable sizing and thermal derating
Ampacity on paper means little until the installation conditions are applied. I derate collection cables for the site's soil thermal resistivity — dry sandy soils shed heat poorly — plus burial depth, earth ambient temperature, and the mutual heating of parallel circuits in a shared trench. Direct-buried cable and cable in duct derate differently, and spare conduits left for the future count thermally if they will ever be loaded. The sizing calculation documents every derating factor so the cable selected for the worst trench section is not silently undersized everywhere else.
Circuit topology and sectionalizing
The single-line diagram is where reliability is won or lost. I lay out feeders so each circuit carries a sensible share of the plant, keeps its voltage drop in bounds, and can be isolated without stranding healthy stations. Sectionalizing devices — load-break switches or reclosers — go at the boundaries between circuit segments, giving operators a way to cut out a faulted section and re-energize the rest. The topology also respects the physical site: circuits follow roads and trench routes that are buildable and maintainable, not straight lines across drainage swales.
MV collection system design checklist
A medium-voltage collection design is ready when it clears this checklist. The collection system is invisible once buried, so the design has to be right the first time. • Conductors sized for full-load current with all thermal derating factors applied • Voltage drop and losses checked at full output against interconnection limits • Circuit topology sectionalized so one fault isolates without darkening the plant • Protection coordinated from station fuses through to the substation breaker • Trench routes buildable, maintainable, and clear of drainage and array conflicts
Which related engineering resources can help?
What else do project teams ask?
Why is 34.5kV the standard collection voltage for solar farms?
How do engineers keep voltage drop within limits on long collection runs?
Should collection circuits run underground or overhead?
What causes collection system losses, and how are they limited?