AEO Answer · Senior Living: Assisted Living & Memory Care

How Is HVAC Designed for Skilled Nursing Care Facilities?

By Jeremy Mills, CEO & Founder, Apex Grid Engineering — USAF Veteran. · Updated 2026-09-15

Skilled nursing HVAC follows ASHRAE 170: prescribed ventilation rates by space, engineered pressure relationships, high-efficiency filtration, tight humidity control, and redundant or emergency-backed air systems — all documented for surveyors.

I'm Jeremy Mills, CEO & Founder of Apex Grid Engineering and a U.S. Air Force veteran. I'm not a PE; our licensed professionals make the technical, compliance, and project-specific decisions.

Illustrative diagram of building MEP systems: ductwork with diffusers, an electrical panel with conduit, and piping runs.

ASHRAE 170 ventilation rates and the pressure map

The engineer starts with the ASHRAE 170 space table: each room type — resident room, toilet, soiled workroom, clean workroom, nourishment, therapy, exam — gets its required outdoor air changes, total air changes, and pressure relationship, cross-checked against the state licensing rules which sometimes exceed the standard. These requirements size the air handlers, the outdoor air intakes, and the exhaust systems, and they dictate the ductwork architecture: dedicated exhaust risers for the negative spaces, supply zoning that can hold each room's pressure, and transfer air paths that are designed rather than left to door undercuts. The pressure map on the drawings shows every room's relationship to its neighbors with the design differentials, and commissioning measures them with the building in normal operating mode — doors closed, systems balanced — to prove the map is real.

Filtration, humidity, redundancy, and documentation

Filtration follows the facility's classification in the standard, with filter banks specified for efficiency, sealing, and change-out access — and the air handler fans sized for the pressure drop of loaded filters, not just clean ones. Humidity control is active, not incidental: the engineer designs humidification for dry climates and seasons plus dehumidification where the cooling process alone can't hold the band, with humidistats in representative zones and alarms on excursion. Reliability is engineered through equipment redundancy on critical air handlers or emergency power carrying ventilation through outages, plus the BAS trending that logs temperature, humidity, and pressure continuously. The documentation package — basis of design, pressure map, commissioning reports, O&M manuals — is assembled as the surveyor's evidence file, because in skilled nursing the building must prove its air quality, not just claim it.

Skilled nursing HVAC checklist

Skilled nursing HVAC works when every room gets its prescribed air, holds its pressure, and proves it continuously. Design to the standard, then prove it. • ASHRAE 170 ventilation rates by space type, verified against state licensing rules • Facility-wide pressure map with negative soiled spaces and neutral-to-positive resident rooms • Filtration efficiency per the standard with fans sized for loaded-filter pressure drop • Active humidity control holding the healthy band with alarming on excursion • Redundant or emergency-backed critical air systems plus continuous BAS trending for surveyors

What else do project teams ask?

What is ASHRAE 170?
ASHRAE Standard 170, Ventilation of Health Care Facilities, is the ventilation standard for healthcare spaces — and skilled nursing facilities fall under its scope. It prescribes minimum outdoor air and total air change rates, pressure relationships, filtration levels, and temperature and humidity ranges by space type. The engineer designs the HVAC to the edition adopted by the jurisdiction and the state health department, and the commissioning process verifies the installation against it. It is the document surveyors expect the design to follow.
How is skilled nursing HVAC different from assisted living HVAC?
In rigor and proof: assisted living resident rooms are designed for comfort, quiet, and individual control, while skilled nursing adds the clinical layer — prescribed air change rates, mandated pressure relationships, higher filtration, active humidity control, and the documentation package that proves compliance to surveyors. The equipment may look similar, but the design basis, the testing, and the paper trail are healthcare-grade. Many skilled nursing buildings also carry more intensive clinical spaces — treatment rooms, therapy gyms, isolation-capable rooms — each with its own requirements.
Do skilled nursing facilities need isolation rooms?
Not necessarily the hospital-grade airborne infection isolation rooms, but the design should provide the capability to isolate: rooms or wings that can be cohorted, with the ventilation zoning to support increased outdoor air and the pressure control to contain. The engineer discusses the operator's infection-control plan during design and provides the air system flexibility — separable zones, exhaust capacity, filtration upgrades — that turns a plan into a building capability. The pandemic taught the industry that isolation flexibility designed in is far cheaper than retrofitted.
How do surveyors evaluate the HVAC system?
By asking for proof: the design documentation showing ASHRAE 170 compliance, commissioning reports with measured airflows and pressure relationships, maintenance logs showing filter changes and equipment service, and BAS trend data demonstrating continuous temperature and humidity control. The engineer assembles this evidence file at turnover and designs the systems — with trending, alarming, and accessible test points — so the facility can keep generating proof for years. A system that works but can't document itself will still draw citations.

Ready to discuss your engineering scope?

Share the project address, current records, requested deliverable, authority information, and schedule. Apex Grid confirms professional responsibility, availability, and scope before work begins.

Request a Project Review

Get a quote on your project

Reviewed and sealed by licensed PEs. “Solid engineering and clear communication from start to finish.” — Jason Mitchell, Principal Architect

Tell us what you need and where the project is — quotes back within 12–24 hours on qualifying scopes.