A shallow foundation is appropriate when competent bearing soil exists within a few feet of the surface and both bearing-capacity and settlement analyses show the building will stay within code and serviceability limits. Spread footings, strip footings, and mats are sized from the geotechnical report's allowable bearing pressures and predicted settlement.
I'm Jeremy Mills, CEO & Founder of Apex Grid Engineering and a U.S. Air Force veteran. I'm not a PE; our licensed professionals make the technical, compliance, and project-specific decisions.
The concise answer
A shallow foundation is appropriate when competent bearing soil exists within a few feet of the surface and both bearing-capacity and settlement analyses show the building will stay within code and serviceability limits. Spread footings, strip footings, and mats are sized from the geotechnical report's allowable bearing pressures and predicted settlement. The governing idea is simple: spread the building's weight over enough soil area that the pressure stays below what the soil can support, and verify the resulting settlement is small and uniform. Everything else — footing depth, reinforcement, frost protection — follows from site conditions and the structural loads.
The two checks that matter
Bearing capacity analysis asks whether the soil is strong enough. The geotechnical engineer derives an allowable bearing pressure from shear strength testing, then the structural engineer sizes each footing so the contact pressure stays under it, including wind and seismic combinations. Overturning and sliding get checked for retaining conditions and lateral loads. Settlement analysis asks whether the building will move too much. Total settlement matters for connections to utilities and adjacent structures; differential settlement — one footing sinking more than its neighbor — is what cracks walls and slabs. Clayey soils settle slowly over years through consolidation, while sands settle quickly as loads are applied. The design has to account for both the magnitude and the timing.
What I verify on every shallow foundation design
Shallow foundations are the most common system I review, and the failures I see are almost always about the interface between the structural design and the geotechnical report — not the concrete itself. A clean design package closes these gaps before drawings go out. This is the checklist I run on every shallow foundation submittal.
- Bearing pressures on the drawings match the geotechnical report's recommendations exactly
- Footings bear below frost depth and clear of topsoil, fill, and expansive surface layers
- Differential settlement is within limits the structure and finishes can tolerate
- Eccentric and combined footings are detailed where columns sit near property lines
- Water table and drainage are addressed so bearing soils don't saturate and weaken
Which related engineering resources can help?
What else do project teams ask?
What is the difference between bearing capacity and settlement?
How deep do shallow foundations typically go?
What soils rule out a shallow foundation?
Do shallow foundations need a geotechnical report?
Ready to discuss your engineering scope?