How Are Sanitary Sewer Lift Stations Designed?

By Jeremy Mills, CEO & Founder, Apex Grid Engineering — USAF Veteran. · Updated 2026-09-15

Sanitary lift stations are designed around a wet well sized for proper pump cycle times, alternating pumps that share the load, a force main sized for scouring velocity, odor control for neighbors, and on-site backup power — because outages coincide with peak inflow.

I'm Jeremy Mills, CEO & Founder of Apex Grid Engineering and a U.S. Air Force veteran. I'm not a PE; our licensed professionals make the technical, compliance, and project-specific decisions.

Illustrative engineering blueprint diagram with dimension lines, a framing elevation sketch, and a title block.

Wet well hydraulics and pump selection

I start the hydraulic design from the inflow hydrograph — average daily flow, peak hourly flow, and the minimum nighttime flow — because the wet well has to behave across that whole range. Active storage between lead-pump-on and all-pumps-off is set by the cycle-time requirement: typically no more than six starts per hour per pump at the design condition. The well diameter and the level spacing come out of that math, and I verify the minimum submergence over the pump intakes so the pumps never vortex air at low level. Pump selection is a system-curve exercise. I plot the force main's head loss from minimum to maximum flow — including the static lift to the discharge point — and select pumps whose curves intersect the system curve at the duty points with margin. Non-clog centrifugal pumps handle typical municipal sewage; grinder pumps earn their keep where the waste stream carries wipes, rags, or other problem solids. Variable-speed drives are worth specifying on larger stations to match pump output to inflow instead of cycling on and off all night.

Controls, alarms, and telemetry

A lift station's controls are its nervous system. Level control — floats, transducers, or both with redundancy — sequences the pumps, and I always design a high-level alarm independent of the pump control, because the alarm that shares the failed sensor is no alarm at all. Telemetry reports pump run status, run hours, power failure, high wet well level, and intrusion to whoever operates the station; on private stations that means the owner's phone, on public stations the utility's SCADA. I require the telemetry to be tested end-to-end during commissioning, not just bench-tested. The control panel lives above the flood elevation in a weatherproof enclosure with ventilation, and the electrical design separates pump power from control power so a tripped pump breaker does not kill the alarm system. I specify surge protection on the telemetry and controls — lift stations sit in low spots that attract lightning, and a fried controller during a thunderstorm is a station running blind during peak inflow.

Lift station design checklist

A sanitary lift station design is ready when it clears this checklist. The station must run unattended for years, so every item targets reliability. • Wet well sized for pump cycle times across minimum to peak inflow, with standby pump capacity • Pump curves verified against the force main system curve at all operating combinations • Automatic alternation with independent high-level alarm and telemetry • Odor control scaled to the neighbors: sealed hatches, ventilation, treatment where needed • On-site generator with automatic transfer, sized for full station load with required fuel storage

What else do project teams ask?

How do you avoid a lift station in the first place?
By grading the site so the building sewer can reach the public main by gravity. During early site planning I compare the finished-floor elevation, the depth of the receiving sewer, and the minimum pipe slopes — if the math works, gravity wins and the lift station never gets designed. Sometimes repositioning the building, adjusting the pad elevation a foot or two, or extending the gravity sewer a few hundred feet eliminates the station entirely. A lift station is a 30-year maintenance commitment with power bills and pump replacements; avoiding one is almost always the right call when the grades allow it.
What causes lift station odors and how are they controlled?
Odor comes from sewage going septic in the wet well — long detention times in warm weather let anaerobic bacteria produce hydrogen sulfide, which smells like rotten eggs and corrodes concrete and metal. Control starts with design: proper wet well sizing keeps detention times short, and sealed hatches with gasketed frames keep gases in. Ventilation exhausts the headspace, and for stations near homes or businesses I add treatment — activated carbon or chemical scrubbing — on the exhaust air. Force main discharge points get odor attention too, since turbulence at the discharge manhole releases gases downstream.
How is backup power sized for a lift station?
For the full station load at peak flow: all duty pumps that could run simultaneously, plus controls, ventilation, odor treatment, lighting, and any heating. I specify an automatic transfer switch so the generator picks up the load without anyone driving to the site, and fuel storage sized to the agency's required runtime — often 24 to 48 hours of continuous operation. The generator gets exercised on a schedule and the fuel gets maintained, because a generator that has not run in two years is a decoration. Some agencies also require telemetry that alarms on power loss and high wet-well level.
What is pump alternation and why does it matter?
Alternation means the controls rotate which pump leads each cycle, so both pumps accumulate equal run hours instead of one doing all the work while the other sits and seizes. The lead pump starts at the first level, the lag pump joins at a higher level if inflow outruns one pump, and the next cycle swaps their roles. I also program a weekly exercise cycle for standby pumps. Without alternation, the lag pump's seals dry out and its motor bearings brinell from sitting — and it fails exactly when the lead pump needs help, which is the worst possible moment.

Ready to discuss your engineering scope?

Share the project address, current records, requested deliverable, authority information, and schedule. Apex Grid confirms professional responsibility, availability, and scope before work begins.

Request a Project Review

Get a quote on your project

Reviewed and sealed by licensed PEs. “Solid engineering and clear communication from start to finish.” — Jason Mitchell, Principal Architect

Tell us what you need and where the project is — quotes back within 12–24 hours on qualifying scopes.