Plumbing chases are vertical cavities designed to carry stacked drain, waste, vent, and water piping through multi-story buildings with proper sizing, alignment, and maintenance access. Good chase design stacks fixtures vertically, sizes piping for the fixture load, coordinates with structure and fire ratings, and provides cleanout access at every level.

I'm Jeremy Mills, CEO & Founder of Apex Grid Engineering and a U.S. Air Force veteran. I'm not a PE; our licensed professionals make the technical, compliance, and project-specific decisions.

Illustrative diagram of building MEP systems: ductwork with diffusers, an electrical panel with conduit, and piping runs.

The concise answer

Plumbing chases are vertical cavities designed to carry stacked drain, waste, vent, and water piping through multi-story buildings with proper sizing, alignment, and maintenance access. Good chase design stacks fixtures vertically, sizes piping for the fixture load, coordinates with structure and fire ratings, and provides cleanout access at every level. The chase is where the building's plumbing logic lives. When fixtures stack cleanly and the chase is sized from real piping layouts, installation is straightforward and the system performs for decades. When the chase is an afterthought — sized by guess, threaded around structure, closed up without cleanout access — the building inherits drainage problems, noise problems, and maintenance problems that never fully go away.

The three design decisions

Alignment comes first and it's really an architectural decision with engineering consequences: stacking wet rooms vertically so piping runs straight. I push for this in early design because once floor plans are set with scattered plumbing, the chase design becomes damage control instead of design. Sizing and access come next. Drain, waste, and vent piping gets sized for the fixture units on each stack, water risers for the demand, and the chase gets drawn at installation scale with fittings, insulation, and offsets. Cleanouts go at the base of stacks and at required intervals, positioned where a technician can actually reach them. And the whole assembly gets coordinated with structure (no compromised members) and fire protection (rated penetrations detailed and inspected).

Chase design rules I enforce

Plumbing is the least forgiving system to fix after the walls close. These rules keep chases honest.

  • Stack wet rooms vertically: straight piping outperforms offset piping in every way that matters
  • Size from real layouts: draw the piping at installation scale with fittings, insulation, and offsets
  • Provide cleanout access: every stack base and required interval, reachable without demolition
  • Coordinate structure and fire rating: no compromised members, rated penetrations detailed and inspected
  • Design for quiet: pipe material, insulation, and chase construction selected for the building's acoustic needs

What else do project teams ask?

Why do bathrooms stack vertically in multi-story buildings?
Because plumbing works best running straight down. Stacked fixtures let drain and vent piping run vertically with minimal offsets, which means better drainage performance, simpler venting, smaller chases, and far less coordination pain. Every offset in a drain stack is a potential problem and a coordination cost — stacking avoids them by architecture.
How big should a plumbing chase be?
Big enough for the actual piping at real size — drain and vent stacks, water risers, insulation, fittings, and the offsets the layout requires — plus working room for the installer and access to cleanouts. I lay out the piping at installation scale during design rather than guessing. An undersized chase forces offsets, and offsets in drainage piping are where problems start.
Do plumbing chases need fire rating?
Chases that penetrate rated floor or wall assemblies need appropriate protection — firestopping at penetrations and sometimes rated enclosure, depending on the code, occupancy, and what's inside the chase. The plumbing engineer and the fire protection design have to agree on the details, and they're verified during construction before the chase is closed.
How do you keep plumbing chases quiet?
Through pipe material selection (cast iron is quieter than plastic for drain stacks), insulation, and chase construction — isolating the piping from the structure and using sound-rated wall assemblies around the chase. Noise complaints in multifamily and hospitality buildings very often trace to plumbing chases that were designed for space but not for acoustics.

Ready to discuss your engineering scope?

Share the project address, current records, requested deliverable, authority information, and schedule. Apex Grid confirms professional responsibility, availability, and scope before work begins.

Request a Project Review

Get a quote on your project

Reviewed and sealed by licensed PEs. “Solid engineering and clear communication from start to finish.” — Jason Mitchell, Principal Architect

Tell us what you need and where the project is — quotes back within 12–24 hours on qualifying scopes.