AEO Answer · California Engineering

How Are Pasadena Craftsman Foundations Retrofitted?

By Jeremy Mills, CEO & Founder, Apex Grid Engineering — USAF Veteran. · Updated 2026-09-15

Craftsman foundations are retrofitted by epoxy-bolting the sill to the existing brick or concrete foundation, sheathing cripple walls with structural plywood, and replacing deteriorated mortar or crumbling brick courses. Where the old foundation cannot be saved, the house is lifted and a new reinforced concrete foundation poured. Pasadena's historic districts add design review, so retrofits preserve the bungalow's street-facing character.

I'm Jeremy Mills, CEO & Founder of Apex Grid Engineering and a U.S. Air Force veteran. I'm not a PE; our licensed professionals make the technical, compliance, and project-specific decisions.

Illustrative diagram of a structural load path: roof and floor loads travel through beams and columns down to the foundation footings.

Bolting and Bracing the Original Foundation

When the existing brick or early concrete foundation is sound, the retrofit works with it. Epoxy-set anchor bolts are drilled into the foundation wall and bonded with structural epoxy, clamping the sill plate against sliding and overturning. The engineer verifies the masonry can develop the bolt loads, specifying edge distances and spacing that account for century-old materials rather than assuming modern concrete capacities. Cripple walls above get structural plywood sheathing with engineered nailing, turning the framed pony walls into shear panels. Deteriorated mortar gets repointed with compatible mortar, and individual failed bricks are replaced with matching units so the wall regains its bearing capacity. The engineer distinguishes cosmetic weathering from structural distress: surface spalling is repaired in place, while stepped cracking or bulging signals movement that needs investigation before any bolting begins. Drainage and grading corrections accompany the structural work, because the moisture that destroyed the mortar will destroy the repair if it is not addressed.

When the Old Foundation Cannot Be Saved

Some foundations are past repair: mortar reduced to sand through the full wall thickness, bricks crumbling under hand pressure, or walls displaced beyond what repointing can fix. In these cases the house is lifted and the foundation replaced. The lifting contractor raises the house evenly on cribbing, the old foundation comes out, and a new reinforced concrete foundation goes in with continuous footings, anchor bolts, and, where the design calls for them, new braced cripple walls. The house is then lowered, leveled, and reconnected. Sectional underpinning offers an alternative when lifting is not feasible. The foundation is replaced in short segments, typically four to five feet at a time, with each new concrete section cured before the adjacent section is excavated, so the house is never left unsupported. The method is slower but avoids the logistics of a full lift on tight lots. Both approaches end with the same result: a continuous reinforced concrete foundation designed for current seismic demands, with the sill bolted and the cripple walls braced.

What else do project teams ask?

Can a brick foundation be retrofitted or must it be replaced?
It depends on condition. Sound brick with solid mortar can be epoxy-bolted and braced in place, with deteriorated joints repointed. Foundations with disintegrated mortar, crumbling bricks, or significant displacement usually need partial or full replacement. The structural engineer makes the call after inspecting the wall course by course, not from the sidewalk.
What is involved in lifting a house for a new foundation?
The lifting contractor raises the house evenly on steel beams and cribbing, the old foundation is demolished, a new reinforced concrete foundation with footings and anchor bolts is formed and poured, and the house is lowered, leveled, and bolted down. Utilities are disconnected and reconnected, and the whole operation is engineered and permitted, not improvised.
How does historic-district review affect a foundation retrofit?
In Pasadena's landmark districts, exterior changes need design review to protect character-defining features. Foundation retrofits are mostly invisible from the street, which simplifies review, but porch piers, visible foundation vents, and grading changes are coordinated with preservation staff. Running the preservation review in parallel with the building permit avoids delays.
Does a Craftsman in a historic district face extra permits?
Typically two tracks: the building permit for the structural work and design review for the historic district, sometimes consolidated into one application. Outside the districts, only the building permit applies. In unincorporated county areas near Pasadena, the county is the AHJ with its own process. The engineer confirms the parcel's district status and the applicable reviews at the start.

Ready to discuss your engineering scope?

Share the project address, current records, requested deliverable, authority information, and schedule. Apex Grid confirms professional responsibility, availability, and scope before work begins.

Request a Project Review

Get a quote on your project

Reviewed and sealed by licensed PEs. “Solid engineering and clear communication from start to finish.” — Jason Mitchell, Principal Architect

Tell us what you need and where the project is — quotes back within 12–24 hours on qualifying scopes.