Stormwater in multi-level parking structures is managed with design-storm drainage on every deck, leaders sized for cumulative flow down the building, ground-level collection with oil and sediment treatment, and a coordinated gravity connection to the site stormwater system — with pumping where inverts require it.

I'm Jeremy Mills, CEO & Founder of Apex Grid Engineering and a U.S. Air Force veteran. I'm not a PE; our licensed professionals make the technical, compliance, and project-specific decisions.

Illustrative diagram of a civil site plan: grading contours around a building pad, a roadway, and storm drainage.

Sizing the vertical leaders

The leaders are the backbone: I size each vertical drain stack for the cumulative tributary area above it at the design rainfall rate, growing the pipe size down the building as more decks join in. The calculation follows the plumbing code's storm drainage tables with the roof-drain methodology applied per deck. Offsets in the leaders are minimized and detailed with cleanouts, because every offset is a future clog point. The leaders run in chases or along column lines, coordinated with the structure so the pipe has a real path — a leader drawn through a beam on paper becomes a field problem in concrete.

Coordinating with the civil engineer

The garage's stormwater design ends at the property line, and the civil engineer's site design begins there — the handoff has to be exact. I coordinate the discharge point location, pipe size, invert elevation, treatment devices, and the design flow rate so the site system receives exactly what the garage delivers. The civil engineer confirms the downstream capacity and the permit requirements; I confirm the garage side can deliver by gravity or needs pumping. This coordination is documented in both drawing sets with matching inverts and flows, because a six-inch invert mismatch at the property line is a redesign.

Parking structure stormwater checklist

A parking structure stormwater design is ready when it clears this checklist. Water follows gravity and the path of least resistance — the design has to be that path. • Every deck drained for the design storm with leaders sized for cumulative flow • Top deck with primary drains plus overflow provisions against clogging • Oil and sediment treatment sized for the design flow with serviceable access • Discharge inverts and flows coordinated with the civil engineer's site system • Duplex pumped discharge with standby power wherever gravity cannot work

What else do project teams ask?

How is the top deck of a garage different for stormwater?
It takes the full design storm with no shelter above it — hydrologically it is a roof. I size its drains, leaders, and overflow provisions for the peak rainfall intensity over its full area, with the same care a roof drainage design gets: primary drains plus overflow scuppers or drains so a clogged primary cannot pond the deck to structural overload. The top deck also sees the worst debris load — leaves, trash, tire fragments — so the drain grates are debris-tolerant and the maintenance plan calls for pre-storm clearing. A top deck that ponds is a structural load the engineer did not intend.
Does parking garage runoff need treatment?
In most jurisdictions, yes. The runoff from traffic areas carries hydrocarbons, heavy metals from brake and tire wear, and sediment — and stormwater regulations treat parking structures as pollutant sources. I check the local requirements early and design the treatment train accordingly: typically an oil-water separator, sometimes with a hydrodynamic separator or filtration for sediment. The treatment devices are sized for the design flow and located with real maintenance access — a separator that cannot be serviced is a separator that stops treating. The maintenance schedule goes into the project documents.
What happens when the garage is below the storm main?
The water gets pumped. Where the lowest collection point — a below-grade level or a low site connection — sits beneath the storm main invert, I design a duplex sump station to lift the collected stormwater to the discharge point. The pumps are sized for the design inflow with the same duplex, alarm, and standby-power reliability as any critical sump. The alternative — regrading the whole site drainage — is rarely practical for an existing garage, which is why the invert coordination with the civil engineer happens in schematic design, when gravity options are still on the table.
Do parking structures need stormwater detention?
Sometimes — it depends on the jurisdiction's rules for the impervious area the structure adds. A garage that replaces a permeable site with acres of concrete deck increases the site's peak runoff, and many codes require detention or retention to offset it. I check the requirement with the civil engineer early, because the detention volume has to go somewhere — a below-grade vault, a surface basin, or an oversized pipe system — and each option has structural and cost implications for the garage project. Finding out about detention at permit review is an expensive surprise.

Ready to discuss your engineering scope?

Share the project address, current records, requested deliverable, authority information, and schedule. Apex Grid confirms professional responsibility, availability, and scope before work begins.

Request a Project Review

Get a quote on your project

Reviewed and sealed by licensed PEs. “Solid engineering and clear communication from start to finish.” — Jason Mitchell, Principal Architect

Tell us what you need and where the project is — quotes back within 12–24 hours on qualifying scopes.