How Is Oklahoma Infrastructure Designed for Ice Storms?

By Jeremy Mills, CEO & Founder, Apex Grid Engineering — USAF Veteran. · Updated 2026-09-15

Oklahoma ice-storm resilience combines ASCE 7 ice loads on structures, utility hardening (undergrounding, tree trimming, breakaway connections), and owner-provided backup power for critical loads. The 2007 storm (641,000 customers out, all 77 counties under emergency) and the 2020 storm proved multi-day outages must be designed around, not wished away.

I'm Jeremy Mills, CEO & Founder of Apex Grid Engineering and a U.S. Air Force veteran. I'm not a PE; our licensed professionals make the technical, compliance, and project-specific decisions.

Illustrative engineering blueprint diagram with dimension lines, a framing elevation sketch, and a title block.

Ice as a Structural Load: ASCE 7 and Building Details

ASCE 7 treats atmospheric icing as a mapped environmental load. The standard provides nominal ice thicknesses by region with concurrent gust wind speeds, and the engineer applies the ice as added weight and increased projected area on every exposed element — lattice towers, monopoles, sign structures, canopies, pedestrian bridges, and rooftop equipment screens. The load combinations pair ice with wind and with dead load, and the connections are designed for the iced condition, because a connection that works bare can fail when every member carries its ice sleeve. Utility structures follow their own standards, but the principle is identical: design the structure for the iced geometry, not the fair-weather one. Building details decide whether ice is a nuisance or a loss. Eave and gutter design should prevent ice-dam formation that backs water under roofing; valleys and low-slope transitions need robust waterproofing membranes beneath the primary roof; and rooftop drainage must remain functional through freeze-thaw cycles. Trees near buildings are a structural hazard in ice country — the 2007 storm leveled large sections of Tulsa's urban forest, and falling limbs are what take out service drops, fences, and roof edges. Site design that keeps large trees clear of structures and overhead services is ice-storm engineering, not landscaping preference.

Backup Power and Critical-Facility Planning

When the grid fails for days, the building's resilience is its generator. Critical facilities need emergency and standby power systems designed to the code's requirements for the occupancy: hospitals, emergency operations, and water infrastructure carry the strictest obligations, and the 2007 storm's lesson — water and sewage plants without power cannot pump — is why utility-adjacent facilities plan for islanded operation. The electrical engineer sizes the generator for the essential loads, designs the automatic transfer scheme, and provides for fuel storage with a realistic refueling plan, because a generator with four hours of fuel is a four-hour solution to a four-day problem. The structural scope of backup power is real: generator sets are heavy, vibrating equipment that needs a designed support — a reinforced pad or structural steel platform — plus seismic anchorage for the unit, the day tank, and the exhaust system. Fuel storage brings fire-code separation and containment requirements that the AHJ reviews. And the entire system needs a maintenance and testing program with load-bank testing on schedule; the industry's open secret is that a large share of installed generators fail to start when called because nobody maintained them. Resilience is not the equipment purchase — it is the design, the installation inspection, and the service contract, in that order.

What else do project teams ask?

How bad was the December 2007 Oklahoma ice storm?
It was one of the costliest ice storms in state history: over an inch of ice across much of Oklahoma, a state of emergency for all 77 counties, more than 641,000 electric customers without power at the peak, some outages lasting over a week, and in Tulsa alone 750 to 800 broken distribution poles and about 150 broken transmission poles.
What is galloping in power lines?
Galloping is a wind-induced oscillation of ice-coated conductors — the asymmetric ice sleeve makes the line aerodynamically unstable, so high winds set spans bouncing in large vertical loops. The dynamic loads can snap crossarms, break poles, and tangle phases, which is why ice plus wind is far more destructive than ice alone.
Can the power grid be made ice-proof?
No. Utilities harden the system by undergrounding lines in new construction and failure-prone corridors, trimming trees aggressively, and using breakaway connections for faster restoration — but utility engineers acknowledge that a major ice storm will still cause widespread damage. Building owners should plan for multi-day outages with on-site generation for critical loads.
How does ASCE 7 address ice on structures?
ASCE 7 provides mapped nominal ice thicknesses with concurrent wind speeds. The engineer applies ice accretion as added weight and increased wind area on exposed structural elements — towers, signs, canopies, open structures — and designs members and connections for the iced load combinations.

Ready to discuss your engineering scope?

Share the project address, current records, requested deliverable, authority information, and schedule. Apex Grid confirms professional responsibility, availability, and scope before work begins.

Request a Project Review

Get a quote on your project

Reviewed and sealed by licensed PEs. “Solid engineering and clear communication from start to finish.” — Jason Mitchell, Principal Architect

Tell us what you need and where the project is — quotes back within 12–24 hours on qualifying scopes.