How Are Roofs Designed for Nor'easter Snow Drifts?

By Jeremy Mills, CEO & Founder, Apex Grid Engineering — USAF Veteran. · Updated 2026-09-15

Noreaster snow-drift design starts with the code's ground snow load, adds drift surcharges at parapets, roof steps, and rooftop equipment per ASCE 7, checks unbalanced loading cases, and designs the roof structure and drainage for the resulting concentrated loads, reviewed by the local building department with structural observation during construction.

I'm Jeremy Mills, CEO & Founder of Apex Grid Engineering and a U.S. Air Force veteran. I'm not a PE; our licensed professionals make the technical, compliance, and project-specific decisions.

Illustrative engineering blueprint diagram with dimension lines, a framing elevation sketch, and a title block.

Where Drifts Form and Why They Are Heaviest There

Every roof obstruction creates an aerodynamic shadow where wind-blown snow drops out of the airstream. Parapets are the classic case: snow scours off the windward portion of the roof and piles against the leeward parapet in a drift whose height is a function of the upwind snow source distance and the parapet height. Roof steps are worse - the high roof acts as a giant snow source feeding a drift on the low roof below, and the drift surcharge there can exceed the uniform design snow load several times over. Rooftop units, penthouses, and adjacent taller buildings each create their own drift zones, and the engineer maps them all. Unbalanced loading adds a second demand on sloped roofs: the code requires checking one slope loaded while the other is stripped, because that is exactly what noreaster winds do. Hip and gable roofs, curved roofs, and roofs with valleys each have their own unbalanced cases. Sliding snow from an upper roof onto a lower one is checked where the geometry allows it. The point of all these cases is that the worst snow load on any part of the roof is rarely the uniform blanket - it is the drift, the unbalanced pile, or the slide, and the structure must handle each where it occurs.

Designing New Roofs and Checking Old Ones

New roof design integrates snow from the first framing layout. The engineer selects the ground snow load for the site from the code's maps, applies exposure, thermal, and importance factors, then computes drift surcharges at every obstruction and adds the unbalanced cases. Members are sized for strength and checked for deflection under the full drift load - a roof that sags under drift invites ponding as meltwater collects in the depression, a failure mode that has collapsed more than one New England roof. Connections, bearing, and the load path down through columns and walls to the foundation are all part of the same calculation. Existing roofs get a forensic version of the same analysis. The engineer documents the as-built framing - member sizes, spans, connections - and runs it against current snow demands including drifts the original designer likely never calculated. Common retrofit findings: joists adequate for uniform snow but not for the drift at the new rooftop unit, parapets added during a reroof that created a drift zone the framing cannot carry, and flat roofs with inadequate slope for drainage. Retrofits range from sistering and added beams to reconfigured rooftop layouts that eliminate the drift source. The evaluation report prioritizes by risk so the owner fixes the drift zones first.

What else do project teams ask?

What is a snow drift surcharge?
An additional snow load the code requires at locations where wind piles snow deeper than the uniform blanket - against parapets, at roof steps, and around rooftop obstructions. The surcharge represents the triangular drift the wind builds in these aerodynamic shadows, and it is added on top of the balanced uniform snow load. At a roof step below a large high roof, the drift surcharge can be the largest load on the structure.
Why do roofs fail at steps and parapets instead of mid-span?
Because that is where the snow actually is. Mid-span sees roughly the uniform load the designer expected; the step and parapet zones carry the drift surcharge - concentrated, heavy, and often unaccounted for in older designs. Failures also cluster where meltwater ponds behind ice dams at these same obstructions, adding water weight to the snow weight. The engineer checks drift zones first because history says that is where roofs let go.
Can an older roof be checked against today's snow loads?
Yes - the engineer surveys the existing framing, establishes member sizes, spans, and connections, and analyzes the roof for current code snow demands including drift and unbalanced cases. Many older New England roofs predate modern drift provisions and fall short specifically at parapets, steps, and rooftop units added over the years. The evaluation identifies exactly where capacity is lacking so retrofits target the real deficiencies.
Do snow requirements differ between the coast and inland New England?
Yes - the code's ground snow load maps vary significantly with location, elevation, and distance from the coast, and each state's building code adopts them with occasional local amendments. A site near the coast may see rain-on-snow effects while an inland hill town sees deeper cold snowpack; the engineer uses the mapped value for the specific site. The local building department, as AHJ, confirms which code edition and amendments apply.

Ready to discuss your engineering scope?

Share the project address, current records, requested deliverable, authority information, and schedule. Apex Grid confirms professional responsibility, availability, and scope before work begins.

Request a Project Review

Get a quote on your project

Reviewed and sealed by licensed PEs. “Solid engineering and clear communication from start to finish.” — Jason Mitchell, Principal Architect

Tell us what you need and where the project is — quotes back within 12–24 hours on qualifying scopes.