AEO Answer · Geotechnical
How Do You Properly Design a Geotechnical Drilling Program?
By Jeremy Mills, CEO & Founder, Apex Grid Engineering — USAF Veteran. · Updated 2026-09-15
A geotechnical drilling program is the engineered plan for subsurface investigation: boring locations and depths, drilling methods, sampling intervals, in-situ and laboratory tests, and groundwater monitoring. It produces the soil data — bearing capacity, settlement characteristics, liquefaction potential, groundwater elevation — that foundation design depends on.
I'm Jeremy Mills, CEO & Founder of Apex Grid Engineering and a U.S. Air Force veteran. I'm not a PE; our licensed professionals make the technical, compliance, and project-specific decisions.
The concise answer
A geotechnical drilling program is the engineered plan for subsurface investigation: boring locations and depths, drilling methods, sampling intervals, in-situ and laboratory tests, and groundwater monitoring. It produces the soil data — bearing capacity, settlement characteristics, liquefaction potential, groundwater elevation — that foundation design depends on. The program is designed around the structure it serves. A single-story retail shell and a five-story podium building on the same block need different programs, because the loads, the settlement sensitivity, and the foundation options are different. The geotechnical engineer's job is to match the investigation to the risk: enough data to design confidently, focused where the building actually bears.
What the program actually specifies
Boring layout comes first: locations tied to the structural grid, with extra borings at the heaviest loads and anywhere the site history suggests fill, buried debris, or old foundations. Then the drilling method — hollow-stem auger in most soils, mud rotary where caving is a risk, rock coring where bedrock or hard layers are expected. Sampling intervals are specified in advance, typically every 2.5 to 5 feet, with continuous sampling through critical zones. In-situ testing is specified alongside the drilling: SPT blow counts at each sample depth, pocket penetrometer or torvane readings on cohesive samples, and sometimes CPT soundings between borings for a continuous profile. The lab program — consolidation, shear strength, Atterberg limits, corrosivity, expansion index — is chosen based on what the field logs reveal, which is why the geotechnical engineer reviews the logs before finalizing the lab scope.
How to get a drilling program that actually serves the design
The investigation is only as good as the communication between the structural engineer and the geotechnical engineer. If the geotech doesn't know the column loads, the foundation options under consideration, or the excavation depth, the program will be generic — and generic borings miss project-specific risks. I make sure the structural criteria reach the geotechnical engineer before the drill rig mobilizes. A few things I insist on for every program.
- Share structural loads and foundation options with the geotechnical engineer before drilling starts
- Measure groundwater over time with monitoring wells, not a single reading on drilling day
- Drill deep enough to find the bottom of every weak or compressible layer, not just its top
- Budget for the lab program after field review — the samples should drive the tests, not the other way around
- Keep the boring logs, lab reports, and recommendations together as the project's geotechnical record
Which related engineering resources can help?
What else do project teams ask?
How many borings does a typical project need?
How deep should the borings go?
What is the difference between SPT and CPT testing?
When do you need groundwater monitoring wells?