How Should Commercial Buildings Plan EV Charging Infrastructure?
By Jeremy Mills, CEO & Founder, Apex Grid Engineering — USAF Veteran. · Updated 2026-09-15
Commercial EV charging is planned through an electrical load assessment, a phased charger rollout, load management to share capacity, and coordination with parking layout and accessibility. Starting with the service capacity prevents surprise utility upgrades, and California's energy code now mandates charging readiness in new construction.
I'm Jeremy Mills, CEO & Founder of Apex Grid Engineering and a U.S. Air Force veteran. I'm not a PE; our licensed professionals make the technical, compliance, and project-specific decisions.
The concise answer
Commercial EV charging is planned through an electrical load assessment, a phased charger rollout, load management to share capacity, and coordination with parking layout and accessibility. Starting with the service capacity prevents surprise utility upgrades, and California's energy code now mandates charging readiness in new construction. The mental model is simple: the electrical service is the budget, the chargers are the spending, and load management is how you live within the budget. Buildings that plan this way add charging smoothly for years. Buildings that skip the assessment hit a wall — literally, at the utility transformer.
Electrical capacity, chargers, and site design
The electrical assessment comes first: a load calculation of the existing service, the spare capacity available, and what charger count that capacity supports with and without load management. Charger selection follows the use case — Level 2 for workplace and multifamily dwell times, DC fast charging for fleet or customer turnover — because the wrong charger type wastes both money and capacity. Site design weaves charging into the parking lot: stall locations that work for circulation, accessible EV stalls per code, lighting and security for the charging area, and conduit routing that's coordinated with civil grading and drainage. For new construction, the EV-ready infrastructure — conduit, pull boxes, panel space, transformer pad space — goes in with the initial underground work. Retrofits need the same design, just with more creative routing around what's already built.
A phased plan that avoids surprises
EV charging works best as a phased infrastructure plan rather than a one-time installation. Here's the structure I use. This is the planning sequence.
- Assess the service: load calculation and utility coordination before any charger count is promised
- Design load management in: share capacity across chargers instead of buying a bigger service
- Build EV-ready infrastructure now: conduit, panel space, and transformer capacity during construction
- Phase the chargers: install to current demand with a documented expansion path
- Coordinate accessibility and site: compliant stall counts, locations, and civil integration from day one
What else do project teams ask?
How many EV chargers does a commercial building need?
What is EV load management and why does it matter?
Do EV chargers need accessible parking stalls?
Should we install chargers now or just make the site EV-ready?