A dry-stack facility is engineered around steel racks sized for boat weights and forklift placement loads, a tall clear-span building, fire suppression for the fuel load, and ventilation and drainage — so hundreds of boats store safely on a compact footprint.
I'm Jeremy Mills, CEO & Founder of Apex Grid Engineering and a U.S. Air Force veteran. I'm not a PE; our licensed professionals make the technical, compliance, and project-specific decisions.
Racks, forklifts, and the building frame
The structural design treats the racks, the forklift, and the building as one system. Rack columns and beams are sized for the boat loads plus placement impact, with bracing that keeps the tall, narrow frames stable under lateral load. The floor slab is designed for the forklift's wheel loads — concentrated and repetitive — on a subgrade verified by geotechnical investigation. The building frame provides the clear spans the racks and forklift need, with the envelope designed for the wind and weather of the site. Crane-like, the forklift's operation imposes dynamic loads the static analysis must account for; I use the manufacturer's data and appropriate impact factors rather than guessing.
Fire, life safety, and operations
Fire protection design starts with a hazard analysis: the fuel load of racked boats, the ignition sources, and the access constraints of a rack-filled building. The sprinkler system is designed for the actual hazard classification with the fire marshal's concurrence, supported by detection that gives early warning in the tall ceiling space and an alarm system the staff understands. Egress paths stay clear of rack operations, and the building gets the emergency lighting and signage a high-occupancy industrial building requires. Operationally, the design provides washdown and drainage collection, staff facilities, and a customer staging area — because the building that launches boats all day is also a business that serves people.
Dry-stack facility checklist
A dry-stack project fails if any of its four systems — racks, forklift, building, fire protection — is designed in isolation. I lock the boat mix and forklift selection first, then design the structure and the building around them, with the fire protection engineered in parallel and the fire marshal engaged early. Commissioning includes load-testing the racks, proving the sprinkler and detection systems, and training the staff on the forklift operating envelope. Here is the checklist I close out with. • Boat mix and forklift specifications locked before structural design begins • Rack structure designed for boat weights, placement impact, and lateral loads • Floor slab and foundations sized for forklift wheel loads on verified subgrade • Fire suppression engineered for the hazard with fire marshal concurrence • Ventilation with CO monitoring for forklift exhaust and fuel vapors • Washdown drainage collection and customer staging areas in the site plan
Which related engineering resources can help?
What else do project teams ask?
How are dry-stack racks structured?
What fire protection does dry-stack storage need?
How does the forklift affect the building design?
What about ventilation in a dry-stack building?
Ready to discuss your engineering scope?
Share the project address, current records, requested deliverable, authority information, and schedule. Apex Grid confirms professional responsibility, availability, and scope before work begins.