AEO Answer · Upper Midwest Plains Engineering
How Should Foundations Be Designed in the Des Moines River Floodplain?
By Jeremy Mills, CEO & Founder, Apex Grid Engineering — USAF Veteran. · Updated 2026-09-15
Des Moines floodplain foundations elevate the lowest floor above the base flood elevation with ASCE 24 detailing, use wet-floodproofed enclosures with flood vents below, and keep basements and equipment out of the flood zone. Dry floodproofing is an option for nonresidential buildings only.
I'm Jeremy Mills, CEO & Founder of Apex Grid Engineering and a U.S. Air Force veteran. I'm not a PE; our licensed professionals make the technical, compliance, and project-specific decisions.
Elevation, Freeboard, and What Goes Below
Elevation is the primary flood defense because it removes the building from the water rather than fighting it. The engineer sets the finished floor from the FEMA base flood elevation plus the locally required freeboard, then designs the foundation system that gets the building there: extended foundation walls, piers, or fill, each with its own detailing rules. Fill used to raise a site must be engineered and compacted, and it cannot divert floodwater onto neighboring properties, which is why floodplain fill needs its own review. Everything below the design flood elevation follows wet-floodproofing rules. Flood vents are sized by the enclosed area so water equalizes quickly, breakaway walls are detailed to collapse under flood loads without dragging the elevated structure down, and finishes are limited to flood-damage-resistant materials. Stairs, elevators, and access to the elevated floor must work without trapping people below, and the design documents the flood openings, materials, and elevations so the elevation certificate matches the as-built condition.
City of Des Moines vs. Unincorporated Polk County
Inside Des Moines, floodplain construction goes through the city's permitting with a floodplain development review layered onto the building permit, and the city enforces its floodplain ordinance alongside the state building code. In unincorporated Polk County, the county administers its own floodplain ordinance with separate application forms, review staff, and inspection scheduling. The engineering standards come from the same federal and state framework, but the paperwork path, fees, and turnaround times differ. This matters most on the urban fringe, where a development can straddle the boundary or sit just outside city limits while connecting to city utilities. The engineer confirms the AHJ before the survey is ordered, because the floodplain determination, the elevation certificate format, and even the freeboard requirement can vary between the two offices. Starting with the wrong jurisdiction's checklist is one of the most common sources of floodplain permit delays.
Which related engineering resources can help?
What else do project teams ask?
What is the base flood elevation in Des Moines?
Can I build a basement in the Des Moines floodplain?
What is the difference between wet and dry floodproofing?
Do the 1993 and 2008 floods still affect Des Moines design?
Who reviews floodplain construction in Des Moines?
Ready to discuss your engineering scope?
Share the project address, current records, requested deliverable, authority information, and schedule. Apex Grid confirms professional responsibility, availability, and scope before work begins.
Request a Project Review