AEO Answer · Intermountain West Engineering

How Are Denver Bentonite Soil Foundations Mitigated?

By Jeremy Mills, CEO & Founder, Apex Grid Engineering — USAF Veteran. · Updated 2026-09-15

Denver engineers mitigate bentonite soils with drilled pier foundations bearing below the moisture-active zone, structural slabs and grade beams isolated from swelling soil by void forms, over-excavated and moisture-conditioned upper soils, and strict site drainage. A geotechnical report sets pier depths and design values for each site.

I'm Jeremy Mills, CEO & Founder of Apex Grid Engineering and a U.S. Air Force veteran. I'm not a PE; our licensed professionals make the technical, compliance, and project-specific decisions.

Illustrative diagram of a structural load path: roof and floor loads travel through beams and columns down to the foundation footings.

How Expansive Bentonite Behaves

Bentonite is a clay mineral with a layered crystal structure that pulls water molecules between its layers, forcing them apart. A bentonite-rich soil can increase in volume by a large fraction of its dry volume when saturated, generating swell pressures that can lift lightly loaded slabs and crack masonry. When the soil dries - during a drought or under a thirsty tree - it shrinks back, sometimes leaving voids under slabs that then crack under load. The damage pattern is distinctive: diagonal cracks at wall corners, heaved interior slabs, and doors that stick in the wet season and free up in the dry one. The Denver basin is well known for these soils because its bedrock includes marine shales that weather into high-plasticity clays. The hazard is not uniform - one lot can test as highly expansive while the neighbor's is moderate - which is why site-specific borings matter more than regional reputation. Fill soils add a second variable: poorly compacted or moisture-sensitive fill can settle or swell on its own schedule. The geotechnical engineer sorts all of this out before the structural engineer sizes a single pier.

The Pier and Void-Form System

Drilled piers work by getting the building's load past the problem. The shaft is drilled through the active zone and into soil or bedrock that does not move with the seasons, and the concrete pier bears on that stable material. Because swelling soil grips the upper shaft and tries to drag it upward, the engineer either sleeves the upper shaft, sizes the pier's depth and reinforcement for the uplift, or both. Belled piers - with an enlarged base - add bearing and uplift resistance where the bearing stratum allows them. Every one of these choices comes from the geotechnical report's test data, not from rules of thumb. Above the piers, the structure is deliberately disconnected from the soil. Grade beams carry the walls from pier to pier, and the floor slab spans structurally between supports. Collapsible void forms - wax-coated cardboard cartons - are placed under beams and slabs to hold a gap during the concrete pour, then soften and crush if the clay swells, so the ground pushes against empty space instead of the structure. Plumbing and utilities crossing the void need flexible detailing so ground movement does not shear them. The system only works as a whole: piers without isolation, or isolation without moisture control, leave the building exposed.

Permitting With the Geotechnical Report

In the Denver metro, the foundation submittal lives or dies on the geotechnical report. The City and County of Denver, Douglas County, Arapahoe County, and Jefferson County each review foundation designs against the report's recommendations, and each applies its own amendments and submittal requirements on top of the state-adopted building code. Plan reviewers commonly ask for the boring logs, the swell test results, and a letter from the geotechnical engineer confirming the structural drawings follow the report. A design that ignores or contradicts the report's pier depths will not clear review. Construction observation closes the loop. The geotechnical engineer typically observes pier drilling to confirm the shafts reach the specified bearing stratum and that the active-zone soils match the borings, and the structural engineer observes reinforcement and void-form placement. For unincorporated sites the county is the AHJ; inside city limits the city is. Review portals, fee schedules, and inspection scheduling differ between them, so the engineer confirms the jurisdiction at the start of the project rather than discovering a second review track mid-permit.

What else do project teams ask?

What makes bentonite soil different from ordinary clay?
Bentonite contains a clay mineral whose layered structure absorbs water between its layers and forces them apart. Ordinary clays change volume modestly with moisture; bentonite-rich soils can swell enough to lift a house slab and shrink enough to leave voids beneath it. That extreme, reversible volume change is what makes bentonite a foundation problem rather than just a soil type.
How deep do drilled piers go in Denver expansive soils?
There is no standard depth - the geotechnical report sets it from boring and swell-test data for each site. Piers must extend below the moisture-active zone into soil or bedrock that does not move with seasonal wetting and drying, and the report also fixes the allowable bearing capacity and uplift design values. The structural engineer sizes every pier from those numbers.
What are void forms and why do they matter?
Void forms are collapsible cartons placed under grade beams and structural slabs to hold an air gap between the concrete and the expansive soil during the pour. If the clay later swells, it crushes the softened cartons and expands into empty space instead of jacking the structure upward. Without that gap, swelling soil bears directly on the concrete and lifts it.
Does the permit path differ between Denver and the surrounding counties?
Yes. The City and County of Denver reviews foundation designs through its own building department and amendments, while unincorporated sites in Douglas, Arapahoe, or Jefferson counties go through the respective county building division. The engineering is the same, but submittal portals, review timelines, fees, and inspection scheduling differ - and the AHJ in each case decides whether the design is approved.

Ready to discuss your engineering scope?

Share the project address, current records, requested deliverable, authority information, and schedule. Apex Grid confirms professional responsibility, availability, and scope before work begins.

Request a Project Review

Get a quote on your project

Reviewed and sealed by licensed PEs. “Solid engineering and clear communication from start to finish.” — Jason Mitchell, Principal Architect

Tell us what you need and where the project is — quotes back within 12–24 hours on qualifying scopes.