CLT achieves a fire rating either by sacrificial charring — oversizing members so the remaining uncharred wood carries the load after a calculated char depth — or by encapsulation behind tested layers of fire-rated gypsum board.
I'm Jeremy Mills, CEO & Founder of Apex Grid Engineering and a U.S. Air Force veteran. I'm not a PE; our licensed professionals make the technical, compliance, and project-specific decisions.
The char calculation
I run the char calculation the way the wood design standards intend: start with the published one-dimensional char rate, multiply by the required fire duration, add the zero-strength layer behind the char front, and check the residual section under the fire-load combination. The fire-load combination is lighter than the design loads — the code recognizes that a building at full design occupancy during a fully developed fire is not the scenario being designed for — so members that look thin for everyday loads can still pass the fire check. I document the calculation member by member, because the plan checker will ask for it and the exercise catches the members where the architecture's exposed-timber ambitions exceed the rating the section can deliver. Panel layup affects the result. A five-ply panel of a given thickness outperforms a three-ply panel of the same thickness in a fire, because more of the section remains in the strong axis after charring. I coordinate the layup with the manufacturer early — changing ply count late in the project ripples through the gravity design, the connection design, and the cost. Edges and ends get the same treatment as faces: I detail edge protection where panels meet, because fire finds the joint the designer forgot.
Encapsulation detailing
Where the design calls for encapsulation, the gypsum layers are a fire-rated assembly and I treat them with the same rigor as a rated shaft wall. The layer count, fastener type and spacing, and joint staggering all follow a tested assembly — I do not invent encapsulation details. Fasteners must bite into the timber adequately without splitting it, and joints are staggered between layers so no continuous seam gives fire a path to the wood. Penetrations for MEP are the chronic failure point: every pipe, duct, and conduit through the encapsulation gets a listed fire-stop, and I coordinate the penetration layout with the MEP engineer so the field is not improvising holes in a rated membrane. I also think about what happens after the fire. Encapsulation that stays in place through the rating period has done its job even if it is destroyed in the process; the design question is whether the timber behind it is reusable. On projects where post-fire salvage matters to the owner, I document the expected char depths and protection performance so the post-fire assessment starts from engineering, not guesswork.
Mass timber fire design checklist
A CLT fire strategy is complete when the structure, the protection, and the concealed spaces are all addressed together. Timber burns predictably — the design has to be equally predictable. • Confirm the construction type and required ratings with the authority having jurisdiction before sizing a single member • Specify CLT with qualified heat-resistant adhesives and collect the manufacturer's certification at submittal • Run the char calculation member by member for exposed timber, including a zero-strength zone behind the char front • Detail encapsulation to a tested assembly — layer count, fasteners, and staggered joints exactly as tested • Protect every connection: conceal steel in timber, cover with encapsulation, or include the joint in the char calculation • Design concealed spaces against fire and smoke travel, and coordinate every MEP penetration with listed fire-stopping
Which related engineering resources can help?
What else do project teams ask?
Does charred wood really keep holding up a building?
What is the difference between encapsulation and exposed mass timber?
Why do adhesives matter in a CLT fire?
Do mass timber connections need fire protection?
Ready to discuss your engineering scope?
Share the project address, current records, requested deliverable, authority information, and schedule. Apex Grid confirms professional responsibility, availability, and scope before work begins.
Request a Project Review