How Does Charleston Elevate Buildings Against Hurricanes and Storm Surge?
By Jeremy Mills, CEO & Founder, Apex Grid Engineering — USAF Veteran. · Updated 2026-09-15
Charleston elevates flood-zone buildings to the Design Flood Elevation: base flood elevation plus one foot of freeboard for residential and plus two feet for commercial. AE-zone buildings use pier or pile foundations with flood vents; VE-zone buildings use open pile foundations with breakaway walls. Historic elevations go through the Board of Architectural Review under its 2019 design guidelines.
I'm Jeremy Mills, CEO & Founder of Apex Grid Engineering and a U.S. Air Force veteran. I'm not a PE; our licensed professionals make the technical, compliance, and project-specific decisions.
Foundations for Elevated Buildings
An elevated foundation does two jobs: it holds the building above the flood and it lets the flood pass underneath. In AE zones, the engineer typically designs reinforced masonry piers or driven piles extending to bearing soils, tied together with grade beams that carry the elevated floor framing. Enclosed areas below the DFE get flood openings sized at one square inch per square foot of enclosed area, positioned to equalize water pressure on both sides of the walls. Solid perimeter walls without vents trap water and fail, so the vent design is structural, not cosmetic. In VE zones the rules tighten because waves, not just still water, attack the foundation. The building must be elevated on pilings or columns with the space below kept free of obstructions, and any enclosure is limited to breakaway walls designed to collapse under wave loads without damaging the elevated structure. The engineer sizes piles for combined gravity, wind, and wave forces plus scour, the erosion of soil around the piles during the storm. Corrosion protection matters in salt air: concrete cover, treated timber, and stainless or hot-dip galvanized connectors extend the foundation's service life.
Elevating Historic Buildings Through the BAR
Charleston's preservation rules recognize that the best way to save a historic building from flooding is to lift it, and the BAR guidelines show how to do it without destroying what makes the building historic. The guidelines address four areas: streetscape and context, site design, foundation design, and architecture. Foundation infill between piers, lattice skirting, and stair and porch reconfigurations are detailed to preserve the building's proportions and historic materials while meeting the DFE. The review path depends on the building's category and the lift height. Category 1 and 2 buildings, the most significant, need Board approval and must document the existing building thoroughly with as-built elevations, floor plans, site plans, and photographs. Category 3 and 4 buildings elevating three feet or less can often proceed with staff approval. The structural engineer coordinates with the preservation architect from the start, because the lift height, the foundation infill design, and the relocated mechanicals all need to satisfy both the flood code and the BAR in a single submittal.
Which related engineering resources can help?
What else do project teams ask?
What is the difference between BFE and DFE?
What is a FEMA variance for elevation?
What are breakaway walls?
Do I need elevation certificates?
Can a commercial building dry-floodproof instead of elevating?