AEO Answer · Structural

What Does the New Madrid Zone Require of Arkansas Buildings?

By Jeremy Mills, CEO & Founder, Apex Grid Engineering — USAF Veteran. · Updated 2026-09-15

In the New Madrid Seismic Zone of northeast Arkansas, buildings require full seismic design under the IBC — ductile lateral systems, diaphragms, and nonstructural bracing for the high seismic design categories. Statewide, the design also handles tornado winds, delta flooding per ASCE 24, and highly expansive delta clays in foundations.

I'm Jeremy Mills, CEO & Founder of Apex Grid Engineering and a U.S. Air Force veteran. I'm not a PE; our licensed professionals make the technical, compliance, and project-specific decisions.

Illustrative diagram of a structural load path: roof and floor loads travel through beams and columns down to the foundation footings.

The concise answer

In the New Madrid Seismic Zone of northeast Arkansas, buildings require full seismic design under the IBC — ductile lateral systems, diaphragms, and nonstructural bracing for the high seismic design categories. Statewide, the design also handles tornado winds, delta flooding per ASCE 24, and highly expansive delta clays in foundations. Arkansas is the clearest example in this series of a state where the seismic hazard surprises people. Nothing about the landscape suggests earthquake country, but the code maps — drawn from the 1811-1812 sequence and modern seismology — put the engineering requirements on par with parts of California for certain building types.

Where the engineering actually lives

Seismic design in the New Madrid region is the complete program: site class determination from the geotechnical investigation, a ductile lateral system selected and detailed for the seismic design category, diaphragms designed for the seismic forces including the code's amplified diaphragm requirements, and nonstructural components — ceilings, equipment, cladding, parapets — braced and anchored. Foundation design accounts for the delta soils: liquefaction mitigation where the investigation identifies liquefiable layers, and expansive-clay detailing where the swell testing demands it. Outside the highest seismic zone, the hazards shift but don't disappear: tornado-region wind design with continuous load paths across the state, ASCE 24 flood provisions along the Mississippi, Arkansas, and White rivers and throughout the delta, and expansive-soil foundations wherever the clays are active. The northwest's Ozark terrain adds slope and karst considerations that the delta never sees — Arkansas's regions design almost like different states.

What keeps an Arkansas project on track

Arkansas rewards engineers who respect the seismic maps even when the landscape doesn't look like earthquake country. The hazard is real, the code is explicit, and the detailing is where buildings survive. Here's my Arkansas checklist.

  • Determine the seismic design category from the maps and geotechnical site class — design the full category, not the assumed one
  • Select a ductile lateral system and detail every connection for seismic demands, not just strength
  • Design diaphragms for amplified seismic forces and verify the load path to the vertical elements
  • Investigate delta soils for both expansive swell and liquefaction — mitigate both in the foundation
  • Apply tornado wind detailing statewide and ASCE 24 flood provisions in the river corridors and delta

What else do project teams ask?

How high is the seismic design category in northeast Arkansas?
Among the highest east of the Rocky Mountains. The code's seismic maps place parts of the region in Seismic Design Category D, which triggers the full suite of seismic requirements: ductile lateral force resisting systems, seismic detailing of connections, diaphragm design, and bracing of nonstructural components. A building type that's exempt from seismic detailing in most states needs the complete seismic treatment in northeast Arkansas.
What lateral systems work for New Madrid seismic design?
The standard ductile systems: special reinforced concrete shear walls, special steel moment frames or braced frames, and properly detailed masonry shear walls — selected for the building type and detailed per the seismic provisions. The key is ductility: the system has to deform through earthquake cycles without losing strength, which means the connection and member detailing matters as much as the system choice. I also make sure the diaphragm can actually deliver the forces to the walls, because the stiffest walls in the world don't help if the diaphragm can't reach them.
Do existing buildings in the New Madrid zone need retrofits?
The code generally doesn't force retrofits of existing buildings, but any substantial alteration, change of occupancy, or addition triggers a structural evaluation and often seismic upgrades. For critical facilities and buildings with known seismic vulnerabilities — unreinforced masonry, non-ductile concrete, soft stories — I recommend voluntary seismic evaluation even without a trigger, because the hazard doesn't wait for a permit application.
How do the delta's expansive clays complicate seismic design?
They attack the foundation while the earthquake attacks the frame. The delta clays have high swell potential, so foundations need the expansive-soil treatment — deep foundations or stiffened systems with moisture control — and the seismic design needs a foundation that stays competent when the ground shakes. The geotechnical investigation has to address both: swell testing for the clays and liquefaction assessment for the saturated delta soils, because parts of the region have liquefiable soils that lose strength in an earthquake.

Ready to discuss your engineering scope?

Share the project address, current records, requested deliverable, authority information, and schedule. Apex Grid confirms professional responsibility, availability, and scope before work begins.

Request a Project Review

Get a quote on your project

Reviewed and sealed by licensed PEs. “Solid engineering and clear communication from start to finish.” — Jason Mitchell, Principal Architect

Tell us what you need and where the project is — quotes back within 12–24 hours on qualifying scopes.