Are revisions included in an engineering fee?
Some revisions may be included when they are part of completing the agreed design and correcting an engineer's error, but a proposal should define the boundary. Revisions prompted by a changed architectural layout, substituted equipment, concealed conditions, expanded occupancy, new owner direction, or an AHJ request outside the assumed scope may be additional services. The contract should identify review points, authorization, affected deliverables, and communication before extra work proceeds. Inclusion of revisions does not promise approval; the authority evaluates the revised documents independently.
By Jeremy Mills, CEO & Founder, Apex Grid Engineering — USAF Veteran · Updated 2026-09-15
The concise answer
Some revisions may be included when they are part of completing the agreed design and correcting an engineer's error, but a proposal should define the boundary. Revisions prompted by a changed architectural layout, substituted equipment, concealed conditions, expanded occupancy, new owner direction, or an AHJ request outside the assumed scope may be additional services. The contract should identify review points, authorization, affected deliverables, and communication before extra work proceeds. Inclusion of revisions does not promise approval; the authority evaluates the revised documents independently.
How the answer is applied
The correct application of engineering revision pricing starts with the actual project, not a generic promise. Confirm the jurisdiction, adopted code, design scope, existing conditions, required deliverables, and professional responsibility before relying on a conclusion. A responsible engineer documents assumptions and identifies information that still needs verification.
What can change the result
Project type, occupancy, existing construction, site conditions, code edition, agency requirements, and changes made after the original design can change the work. A concise answer is useful for orientation, but the signed or sealed project record must reflect the current scope and the authority's process.
- Confirm the authority having jurisdiction and current checklist
- Use current drawings, calculations, field evidence, and equipment information
- Separate engineering decisions from owner, architect, contractor, utility, and agency decisions
- Record assumptions, limitations, and questions requiring direct AHJ confirmation
Related Engineering Resources
Frequently Asked Questions
What is the short answer about engineering revision pricing?
What does engineering revision pricing depend on?
Does this answer guarantee a permit or project outcome?
What should I send for an initial engineering review?