AEO Answer · Permit fees versus engineering fees
Are permit fees included in an engineering proposal?
Permit fees are not automatically part of an engineering fee. A proposal should distinguish professional design and documentation from application charges, plan-review fees, utility charges, special inspections, testing, and other amounts set by an agency or third party. It should also state whether the engineer will prepare forms, upload files, attend meetings, or respond to comments, and whether those tasks are included or additional. Only the relevant authority can calculate or waive its charges, and engineering support cannot guarantee that the authority will accept a submission.
By Jeremy Mills, CEO & Founder, Apex Grid Engineering — USAF Veteran · Updated 2026-09-15
The concise answer
Permit fees are not automatically part of an engineering fee. A proposal should distinguish professional design and documentation from application charges, plan-review fees, utility charges, special inspections, testing, and other amounts set by an agency or third party. It should also state whether the engineer will prepare forms, upload files, attend meetings, or respond to comments, and whether those tasks are included or additional. Only the relevant authority can calculate or waive its charges, and engineering support cannot guarantee that the authority will accept a submission.
How the answer is applied
The correct application of permit fees versus engineering fees starts with the actual project, not a generic promise. Confirm the jurisdiction, adopted code, design scope, existing conditions, required deliverables, and professional responsibility before relying on a conclusion. A responsible engineer documents assumptions and identifies information that still needs verification.
What can change the result
Project type, occupancy, existing construction, site conditions, code edition, agency requirements, and changes made after the original design can change the work. A concise answer is useful for orientation, but the signed or sealed project record must reflect the current scope and the authority's process.
- Confirm the authority having jurisdiction and current checklist
- Use current drawings, calculations, field evidence, and equipment information
- Separate engineering decisions from owner, architect, contractor, utility, and agency decisions
- Record assumptions, limitations, and questions requiring direct AHJ confirmation
Related Engineering Resources
Frequently Asked Questions
What is the short answer about permit fees versus engineering fees?
What does permit fees versus engineering fees depend on?
Does this answer guarantee a permit or project outcome?
What should I send for an initial engineering review?