AEO Answer · Electrical

What Is an Arc Flash Study and Do I Need One?

By Jeremy Mills, CEO & Founder, Apex Grid Engineering — USAF Veteran. · Updated 2026-09-15

An arc flash study is an electrical engineering analysis that quantifies arc flash hazards: it models the power distribution system, calculates available fault current at each equipment location, determines how quickly protective devices clear faults, computes the incident energy a worker would face, and specifies approach boundaries and PPE categories. Equipment gets labeled with the results per NFPA 70E.

I'm Jeremy Mills, CEO & Founder of Apex Grid Engineering and a U.S. Air Force veteran. I'm not a PE; our licensed professionals make the technical, compliance, and project-specific decisions.

Illustrative diagram of building MEP systems: ductwork with diffusers, an electrical panel with conduit, and piping runs.

The concise answer

An arc flash study is an electrical engineering analysis that quantifies arc flash hazards: it models the power distribution system, calculates available fault current at each equipment location, determines how quickly protective devices clear faults, computes the incident energy a worker would face, and specifies approach boundaries and PPE categories. Equipment gets labeled with the results per NFPA 70E. The incident energy number is the heart of it — measured in calories per square centimeter, it tells you how much heat energy reaches a worker's body at a working distance. That number selects the PPE: from basic arc-rated clothing up to full flash suits. Lower incident energy means ordinary work can proceed with standard protection; higher energy may mean de-energizing is the only safe option.

How the analysis is performed

The study starts with data collection: a field survey of the actual electrical system — every panel, transformer, breaker, and fuse, with settings and cable lengths — because the model is only as good as the field data. Then the engineer builds the system model in power analysis software and runs short-circuit calculations to find the available fault current at each bus. Next comes protective device coordination: how fast will the upstream breaker or fuse clear the fault? Clearing time multiplies with fault current to produce incident energy, so a slow breaker makes a bad situation worse. The engineer evaluates whether adjusting breaker settings can reduce incident energy — often the cheapest hazard reduction available. The deliverable is the full report plus the equipment labels: incident energy, working distance, arc flash boundary, and required PPE at each location.

What the study changes in practice

A completed study changes how electrical work gets done in the facility. Maintenance staff get trained on the labels and boundaries. Work procedures get written around the PPE categories — some tasks that were done casually now require flash suits or de-energization. The labels themselves are the daily reminder, posted on every analyzed piece of equipment. The study also frequently uncovers system issues worth fixing regardless of arc flash: breakers set wrong, coordination problems, equipment in poor condition. I treat the field survey as a health check on the whole distribution system, not just data gathering. For new construction, I run the study from the design documents so the building opens with labeled equipment and a compliant safety program on day one.

  • Field survey: every device, setting, and cable length verified in the actual facility
  • Short-circuit modeling: available fault current calculated at each equipment bus
  • Coordination review: clearing times evaluated — faster clearing means lower incident energy
  • Labeling: incident energy, boundaries, and PPE posted on each piece of equipment
  • Maintenance: review every five years and after significant system changes

What else do project teams ask?

Is an arc flash study required by law?
OSHA requires employers to protect workers from electrical hazards, and NFPA 70E — the consensus standard OSHA points to — requires arc flash risk assessments for work on energized equipment. Many jurisdictions and insurers effectively require the study and labeling. Practically speaking, if your electricians open panels energized, you need the study done.
How often does the study need updating?
NFPA 70E calls for review at least every five years, and any significant change to the electrical system — new service, added equipment, changed protective settings — should trigger an update sooner. An outdated study is arguably worse than none, because workers trust labels that no longer reflect reality.
Does this guarantee permit approval?
No. Engineering documents support a defined project scope, while the authority having jurisdiction controls its interpretation, completeness decision, review queue, and approval.
What should I send for an initial review?
Send the project address, plain-language scope, current drawings, existing-condition records, relevant calculations or comments, schedule, and the authority or code information already available. The responsible engineer will identify gaps.

Ready to discuss your engineering scope?

Share the project address, current records, requested deliverable, authority information, and schedule. Apex Grid confirms professional responsibility, availability, and scope before work begins.

Request a Project Review

Get a quote on your project

Reviewed and sealed by licensed PEs. “Solid engineering and clear communication from start to finish.” — Jason Mitchell, Principal Architect

Tell us what you need and where the project is — quotes back within 12–24 hours on qualifying scopes.