How Are Agrivoltaic Systems Engineered for Crops and Grazing?
By Jeremy Mills, CEO & Founder, Apex Grid Engineering — USAF Veteran. · Updated 2026-09-15
Agrivoltaic systems are engineered around the farm operation: elevated racking clearing equipment or livestock, widened rows for light and machinery, hardened electrical routing, and water and access planning shared with the agricultural calendar.
I'm Jeremy Mills, CEO & Founder of Apex Grid Engineering and a U.S. Air Force veteran. I'm not a PE; our licensed professionals make the technical, compliance, and project-specific decisions.
Structural design for agricultural clearances
Elevated agrivoltaic structures carry bigger moments and more steel than standard racking — height multiplies wind load, and the wider spans between foundations increase the frame sizes. I design the foundations for the overturning from the taller structure plus the farm's soil conditions, which are often softer agricultural soils. Bracing and connections are detailed for the dynamic loads of equipment operating beneath and around the array. The structural drawings call out the clearance envelope explicitly so future equipment purchases do not outgrow the array.
Electrical and water infrastructure on a working farm
The electrical layout keeps the farm workable: inverter stations and transformers outside the cultivated area or behind barriers rated for farm equipment impact, DC and AC routing overhead or buried with farm-proof protection, and disconnects accessible without driving through crops. Water design serves both uses — panel washing supply, if the soiling analysis justifies it, tied into the farm's water system with backflow protection, and drainage that handles both the array's drip lines and the field's irrigation runoff. Every trench and foundation is mapped so future tillage and drainage tile work does not find them by accident.
Agrivoltaic engineering checklist
An agrivoltaic design works when it clears this checklist. The farm was there first — the solar has to fit the operation, not the other way around. • Structure height and clearances set from the actual farm equipment dimensions • Row spacing admitting the light and machinery the crop plan requires • Electrical routing hardened or elevated beyond livestock and equipment reach • Foundations designed for taller structures in agricultural soils • O&M and access coordinated with the planting, grazing, and harvest calendar
Which related engineering resources can help?
What else do project teams ask?
How tall do agrivoltaic structures need to be?
Do solar panels hurt crop yields underneath?
How are electrical systems protected from livestock?
What changes in the O&M plan for an agrivoltaic site?